Search Results

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

Beams-doc-# Title Author(s) Topic(s) Last Updated
3184-v2 Monitoring the consequences of ground motion on accelerators James T. Volk Alignment
24 Jun 2009
1977-v1 MI8 Beamline Collimation Design Bruce C. Brown Transfer Lines
Collimation
22 Apr 2008
2039-v1 Tritium Production in the Dolomitic Rock Adjacent to NuMI Beam Tunnels Samuel R. Childress et al. Radiation Safety
05 Dec 2005
733-v1 A NUMI Wide-Band Beam Shield Design That Meets The Concentration Model Ground Water Criteria William S. Freeman ES&H
Decay Pipe
16 Jul 2003
309-v2 Ground Water, Air-Borne and Soil Activation from the Operation of the MI-40 Beam Absorber During the FMI Era Chandrashekhara M. Bhat ES&H
01 Dec 1997
305-v2 A Preliminary Analysis of Ground-Water and Surface-Water Radioactivity Around the Main Injector Extraction and Injection Regions Chandrashekhara M. Bhat et al. ES&H
Studies
01 Nov 1997
235-v1 Groundwater, Air-Borne and Soil Activation from the Operation of the Temporary Beam Absorber in the MI-8 GeV Beam Line Chandrashekhara M. Bhat et al. ES&H
Civil
25 Jan 1997
211-v2 Ground-water Activation from the Operation of MI40 Beam Absorber Chandrashekhara M. Bhat et al. ES&H
Design Properties
28 Aug 1996
95-v1 Radioactivity of the Closed Loop Cooling Water of the Main Injector Beam Abort Dump Chandrashekhara M. Bhat ES&H
Design Properties
01 Sep 1993
Number of documents found: 9

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.7.23, contact Beams Document Database Administrators
Execution time: 0 wallclock secs ( 0.22 usr + 0.02 sys = 0.24 CPU)