Search Results

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

Beams-doc-# Title Author(s) Topic(s) Last Updated
4222-v1 Hydrostatic Level Systems at Fermilab and SURF James T. Volk Alignment
19 Sep 2012
3889-v3 Linac Beam Velocity Measurement Craig C Drennan Operations
Beam Instrumentation
Operations
Front-end Systems
Controls
Beam Instrumentation
24 Jul 2012
3940-v1 Linac Toroid Upgrade Meeting Summaries -- Sept, 2, 2011 -- Oct. 27, 2011 Craig C Drennan Beam Instrumentation
Front-end Systems
Intensity Measurements
16 Jul 2012
3789-v2 NTF BPM: Note on the New BPM Installation In the NTF Beam Line Craig C Drennan NTF
06 Oct 2011
3948-v2 Toroid Requirements in the Linac Craig C Drennan et al. Beam Instrumentation
20 Sep 2011
3801-v4 Beam Position Monitor Requirements in the Linac and 400 MeV Line Craig C Drennan Beam Instrumentation
Upgrades
12 Sep 2011
3767-v1 Meeting Minutes: Linac Multi-Wires in the Momentum Dump Line Craig C Drennan Studies
Operations
Beam Instrumentation
Linac
Upgrades
05 Jan 2011
3649-v2 8-GeV Pbar Horizontal instability in Main Injector Ming-jen Yang et al. Main Injector
Instabilities
10 Aug 2010
1410-v10 BLM Upgrade Users' Guide Alan Baumbaugh et al. Beam Instrumentation
Beam Loss Monitors (BLM)
Instrumentation
Beam Instrumentation
TeV ABORT
21 Jun 2010
3376-v1 Booster BPM Info and Measurement Summary James A. Fitzgerald Beam Instrumentation
27 Apr 2009
3247-v1 Procedure of the AC Dipole Measurements Ryoichi Miyamoto Instrumentation
07 Nov 2008
3205-v4 Pulse Stretcher Application For Measuring BDot Coils on Booster MP02 Current Craig C Drennan Beam Instrumentation
Booster
29 Sep 2008
3097-v1 Impressions from the 13th Beam Instrumentation Workshop BIW2008 Vsevolod Kamerdzhiev et al. Accelerator Seminar
Instrumentation
21 May 2008
2301-v3 Proposed MI BPM 2.5MHz Transition Board Gains Bob Webber Beam Instrumentation
BPM
BPM
03 Oct 2006
2000-v1 BLM System Control Bus Testing Kelly L Knickerbocker Beam Instrumentation
Beam Loss Monitors (BLM)
Instrumentation
Beam Instrumentation
31 Oct 2005
1994-v1 BLM VME J2 Backplane Impedance Kelly L Knickerbocker Beam Instrumentation
Beam Loss Monitors (BLM)
Instrumentation
Beam Instrumentation
31 Oct 2005
1908-v3 MI BPM Upgrade Review -- Overview Talk Bob Webber BPM
BPM
25 Jul 2005
1781-v1 AC Dipole in the Tevatron Andreas Jansson Instrumentation
15 Apr 2005
1736-v1 BLM VME J2 Backplane Crosstalk Evaluation Kelly L Knickerbocker Beam Instrumentation
Beam Loss Monitors (BLM)
Instrumentation
Beam Instrumentation
16 Mar 2005
1567-v6 Documentation on Tev flying wire Transverse emittance OAC TEMITF Nathan Eddy et al. Emittance
Instrumentation
Flying Wires
Instrumentation/beam Physics
Flying Wires
14 Mar 2005
1465-v1 Lattice Parameters for Tev Instrumentation Valeri A Lebedev et al. Emittance
Instrumentation
Shot Data Analysis (SDA)
SyncLite (SL)
Flying Wires
Flying Wires
18 Nov 2004
1462-v1 Automated store by store calibration of the SBD and FBI in the Tevatron. Timofei B Bolshakov et al. FBI
Instrumentation
Sampled Bunch Display (SBD)
DCCTs
17 Nov 2004
1346-v1 Optical set-up for the digital camera system at FNPL Philippe R.-G. Piot et al. Diagnostics
OTR
15 Sep 2004
1121-v1 Recommendations for Support of Small Embedded Systems Tom Meyer et al. Controls Working Group
14 Apr 2004
975-v1 Meeting on measuring tunes in Tev - Jan 14, 2004 Andreas Jansson et al. Tevatron Tune
Instrumentation
15 Jan 2004
974-v2 Tevatron Tunes, Brief status report, 21.4 MHz and 1.7 GHz Schottky Paul Lebrun Tevatron Tune
14 Jan 2004
889-v1 NuMI Primary Beam Design Report Samuel R. Childress et al. Primary Proton Beam
30 Oct 2003
606-v1 CERN SPS Emittance Measurements Federico Roncarolo Ion Profile Monitor
SyncLite (SL)
Flying Wires
16 May 2003
Number of documents found: 28

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.7.23, contact Beams Document Database Administrators
Execution time: 1 wallclock secs ( 0.20 usr + 0.02 sys = 0.22 CPU)