Search Results

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

Beams-doc-# Title Author(s) Topic(s) Last Updated
4015-v1 Booster Beam Notching Overview for 2012 Salah Chaurize Booster
07 Dec 2011
646-v1 A48 Collimator: Beam Physics Justification and Simulation Alexandr Drozhdin et al. Energy Deposition
Collimators
02 Jun 2008
961-v1 Painting injection to the Fermilab Main Injector Alexandr Drozhdin et al. Project
02 Jun 2008
648-v2 Tevatron Abort Kicker Prefire Simulations Mike Church et al. Kickers and Separators
Collimators
02 Jun 2008
647-v3 Tevatron Abort Kicker Prefire Simulations (Review of the A48 Collimator Design) Alexandr Drozhdin Energy Deposition
Collimators
02 Jun 2008
2950-v1 Dark Current Kicker Progress Report Cheng-Yang Tan Dark Current
05 Dec 2007
2833-v1 Kicker Design Discussions Held at PAC2007 and Plans for NML Cheng-Yang Tan Dark Current
10 Jul 2007
2772-v1 Comparing the Dark Current Kicker and the ILC Damping Ring Kicker Specifications Cheng-Yang Tan Dark Current
08 May 2007
2706-v1 NML dark current kicker Geometry Cheng-Yang Tan Other
20 Mar 2007
2703-v1 Dark Current Kicker Requirements for NML Mike Church Operations
20 Mar 2007
1282-v1 Analysis of 4/15/2004 Abort Kicker Prefire Dean A. Still Collimators
03 Aug 2004
1171-v1 A0 Abort Timing Bruce Hanna TeV ABORT
20 May 2004
169-v1 Recycler Pbar Transfer Lines David E. Johnson Transfer Lines
01 Aug 2003
179-v2 Magnetic Field Quality Specification for Recycler Ring Combined Function and Quadrupole Magnets Norman M. Gelfand et al. Magnets
Studies
23 Jul 2003
91-v1 Resonant Charging and Pulse Sharpening for the Proton Injection Kicker: Test Results from MKS-90 Main Ring System Chris Jensen et al. Power Supplies
Design Properties
03 Jul 2003
649-v1 Tevatron Abort Kicker Prefire Simulations Mike Church et al. Collimators
03 Jun 2003
355-v1 Recycler Corrector Status David E. Johnson Alignment
09 Sep 2000
347-v1 Single Turn Extraction Design for NuMI David E. Johnson Extraction
Extraction from Main Injector
Design Properties
Civil
Civil Construction
06 Jan 2000
328-v1 Transient Measurement of the Betatron Phase Advance Around the Recycler Ring Gerald P. Jackson Beam Instrumentation
Controls
Lattice
16 May 1998
314-v1 Recycler Dump Magnet Requirements David E. Johnson et al. Magnets
Magnets
16 Feb 1998
310-v1 Options for Line-of-Sight Signal Transmission of the Recycler Stochastic Cooling Systems Gerald P. Jackson Stochastic Cooling
Magnets
27 Oct 1997
226-v1 Timing Requirements for the 8 GeV Proton Injector Kicker David E. Johnson Controls
02 Jun 1997
171-v2 MI-10 Injection Layout David E. Johnson Transfer Lines
Civil
17 May 1996
80-v1 Kicker Operating Margins David E. Johnson Magnets
Magnets
03 Mar 1993
35-v1 Proposal for MI Injection and Extraction Kickers John A. Dinkel Magnets
10 Jun 1990
26-v2 MI_15 Kicker Specifications David E. Johnson Extraction
Transfer Lines
Magnets
17 Apr 1990
Number of documents found: 26

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.7.23, contact Beams Document Database Administrators
Execution time: 1 wallclock secs ( 0.21 usr + 0.03 sys = 0.24 CPU)