Search Results

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

Beams-doc-# Title Author(s) Topic(s) Last Updated
4519-v1 Studies of MI Beam Intensity, Loss and Activation Patterns Bruce C. Brown Beam Instrumentation
ES&H
DCCTs
16 Feb 2017
5101-v1 A historical comparison of Booster radiation activations surveys William A Pellico Booster
16 Mar 2016
4733-v1 Impact of Laser Notcher on Radiation in MEBT David E. Johnson Projects
ES&H
22 Dec 2014
4679-v1 Total Loss Monitor Radiation Safety System Anthony F. Leveling Muon
Accelerator Seminar
Booster
08 Oct 2014
4493-v1 Ultra High Input Impedance Electrometer/Pulse Train Converter For the Measurement of Beam Losses Dan Schoo Mu2e
04 Dec 2013
4332-v1 ASTA Low Energy Enclosure Shielding Drawings Mike Church NML
02 Apr 2013
3980-v2 Analysis Procedures for Al Activation Studies Bruce C. Brown Beam Instrumentation
Beam Loss Monitors (BLM)
ES&H
Energy Deposition
Collimation
09 Apr 2012
4026-v1 Muon Task Force Valeri A Lebedev Mu2e
20 Dec 2011
3964-v1 Project X Based Muon Factory Valeri A Lebedev Mu2e
06 Oct 2011
3732-v1 Linac and Booster Radiation Shielding Status, Plans and Constraints John E Anderson Linac
Booster
ES&H
ES&H
08 Dec 2010
3717-v1 Comparison of Short Term Cooldown Data for MI Collimator C307 Near Beam and Beside Marble Shielding Amir Jaehoon Safavi ES&H
17 Nov 2010
3576-v2 Radiation Shielding Tests for Laser Power Supply David E. Johnson Project X
Beam Instrumentation
18 Mar 2010
3523-v1 Residual Radiation Monitoring in the Main Injector with the ROTEM RAM DA3-2000 Radiation Survey Meter Bruce C. Brown Other
16 Dec 2009
3502-v1 HINS Shielding/Dose Calculation with Shielding Cracks Nikolai Mokhov Project X
Proton Driver
Energy Deposition
19 Nov 2009
3219-v1 Analysis of Some Crude Main Injector Radiation Cool-down Data Bruce C. Brown ES&H
Operations
03 Oct 2008
1926-v2 Reducing Losses in Main Injector by MI8 Line Scraping Bruce C. Brown et al. Studies
Electron Cooling
Transfer Lines
Collimation
22 Apr 2008
1977-v1 MI8 Beamline Collimation Design Bruce C. Brown Transfer Lines
Collimation
22 Apr 2008
2287-v1 Mechanical Design of MI8 Collimators Bruce C. Brown et al. Transfer Lines
Collimation
22 Apr 2008
2388-v2 Thermal Calculation for MI8 Collimators Bruce C. Brown et al. Transfer Lines
Collimation
22 Apr 2008
2426-v2 MARS15 Calculations for MI8 Collimator Design Bruce C. Brown et al. Proton Plan
ES&H
Transfer Lines
Collimation
22 Apr 2008
3023-v1 Advanced Accelerator R&D at the A0 Photoinjector Raymond P Fliller Diagnostics
Experiments
Photoinjector
06 Feb 2008
1975-v2 Optical Imaging of the Tevatron Beam using Synchrotron Radiation Randy M Thurman-Keup Emittance
SyncLite (SL)
Instrumentation
29 Jan 2008
336-v1 Shielding Assessment of the Main Injector Complex Chandrashekhara M. Bhat et al. Studies
19 Nov 2007
2834-v1 Main Injector Residual Radiation Data 2004 - 2007 Bruce C. Brown ES&H
11 Jul 2007
2595-v2 Proceedings of the miniworkshop on Possible Advanced Accelerator R&D Directions at the ILC Test Accelerator (NML) at Fermilab Philippe R.-G. Piot Beam Dynamics
Optics
Adv. Accelerator R&D
28 Dec 2006
2489-v1 OTR Measurements and Modeling of the Electron Beam Parameters at the E-cooling Facility Arden A. Warner Electron Cooling
OTR
29 Sep 2006
2322-v1 High energy H- ion transport and stripping Weiren Chou Future Accelerators
05 Jul 2006
2321-v2 8 GeV H- ions: transport and injection Weiren Chou Future Accelerators
05 Jul 2006
2220-v1 Losses at AP50 During Stacking Steve Werkema Debuncher
Run II Upgrades
30 Mar 2006
1382-v2 Residual Radiation Hints for Aperture and Alignment Issues in the Main Injector Bruce C. Brown Alignment
ES&H
Vacuum
18 Jan 2005
1430-v2 Booster Corrector System Specification David J. Harding et al. Upgrades
Projects
Controls
05 Nov 2004
1346-v1 Optical set-up for the digital camera system at FNPL Philippe R.-G. Piot et al. Diagnostics
OTR
15 Sep 2004
1336-v1 Radiation tests of the Texas Instruments TLK2501 in the Tevatron Tunnel Andreas Jansson Ion Profile Monitor
Instrumentation
08 Sep 2004
1036-v1 Beam to NuMI Peter Kasper Primary Proton Beam
24 Feb 2004
1013-v1 Report of the Review of the BTeV Interaction Point - October 7, 2003 Michael J. Syphers CZero IR Development
11 Feb 2004
846-v2 First Tests of an Optical Transition Radiation Detector for High-Intensity Proton Beams at FNAL Vic Scarpine OTR
25 Sep 2003
148-v2 AP4 Beam Dump and Allowed Beam Intensity Limit During the Construction Phase of theMI-8 GeV Beam-line Chandrashekhara M. Bhat Beam Dynamics
ES&H
10 Jul 2003
105-v1 Radiation Levels in the 8 GeV Beamline Arising from the Tevatron Beam Losses Chandrashekhara M. Bhat et al. ES&H
24 Jun 2003
515-v1 Proton Economics Elliott S McCrory Operations
Operations
20 Mar 2003
344-v1 Preliminary Measurement of Airborne Radioactvity in the MI40 Absorber Room and at MI40 Abort Lambertsons Anthony F. Leveling Studies
ES&H
07 Apr 1999
342-v1 Radiation Dose Rate Measurement at Tevatron Wave Guide Penetrations at F0 Service Building due to 8 GeV Proton Beam Loss Anthony F. Leveling ES&H
05 Feb 1999
332-v1 Determination of Interlock Gate Locations at E35, F47, and A25 Anthony F. Leveling Studies
ES&H
Civil
15 Sep 1998
330-v1 Committed Effective Dose Equivalent Calculation for Personnel Exposure to Airborne Radioactivity Produced by Main Injector Beam Loss Anthony F. Leveling Studies
ES&H
07 Jul 1998
315-v1 Main Injector and Recycler Ring Shielding Assessment Chandrashekhara M. Bhat et al. Studies
ES&H
01 Jul 1998
309-v2 Ground Water, Air-Borne and Soil Activation from the Operation of the MI-40 Beam Absorber During the FMI Era Chandrashekhara M. Bhat ES&H
01 Dec 1997
305-v2 A Preliminary Analysis of Ground-Water and Surface-Water Radioactivity Around the Main Injector Extraction and Injection Regions Chandrashekhara M. Bhat et al. Studies
ES&H
01 Nov 1997
307-v2 Shielding Assessment of F0 to Switchyard Beam Line Enclosure for MI 120 GeV Beam Transport Chandrashekhara M. Bhat Beam Dynamics
ES&H
Transfer Lines
16 Sep 1997
289-v1 Main Injector 8 GeV Beam Line Shielding Assessment Chandrashekhara M. Bhat et al. ES&H
Magnets
17 Feb 1997
235-v1 Groundwater, Air-Borne and Soil Activation from the Operation of the Temporary Beam Absorber in the MI-8 GeV Beam Line Chandrashekhara M. Bhat et al. ES&H
Civil
25 Jan 1997
211-v2 Ground-water Activation from the Operation of MI40 Beam Absorber Chandrashekhara M. Bhat et al. ES&H
Design Properties
28 Aug 1996
197-v1 8 GeV Beam Absorber for Beam Line Commissioning Chandrashekhara M. Bhat et al. ES&H
Design Properties
Commissioning
31 Jul 1996
146-v2 Radiation Level in the Intersection Region of AP2 and 8 GeV Beam-line due to Beam Loss in the AP2 Beam-line Chandrashekhara M. Bhat et al. Beam Dynamics
ES&H
23 Aug 1995
136-v2 µ-Dose Level in the Vicinity of the Intersection of the 8 GeV and the AP2-Beamlines Chandrashekhara M. Bhat Beam Dynamics
ES&H
28 Jun 1995
100-v1 Radiation Levels in the MI-60 Enclosure from Tevatron Beam Losses Chandrashekhara M. Bhat Beam Dynamics
ES&H
Civil
08 Nov 1993
95-v1 Radioactivity of the Closed Loop Cooling Water of the Main Injector Beam Abort Dump Chandrashekhara M. Bhat ES&H
Design Properties
01 Sep 1993
88-v3 Radiation Shieldings for MI Culverts Chandrashekhara M. Bhat ES&H
Design Properties
Civil
01 Aug 1993
87-v2 A Design Study of the MI40 Beam-Abort Dump Chandrashekhara M. Bhat ES&H
Design Properties
29 Jul 1993
68-v1 Conceptual Design Report of Vacuum Pumping System for Main Injector Shuxiu Zhang Vacuum
Vacuum
30 Dec 1991
Number of documents found: 58

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.7.23, contact Beams Document Database Administrators
Execution time: 1 wallclock secs ( 0.34 usr + 0.06 sys = 0.40 CPU)