Search Results

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

Beams-doc-# Title Author(s) Topic(s) Last Updated
4460-v1 A Collimation Mask at MI308 to Protect RR to MI Injection Kickers Bruce C. Brown Collimation
15 Oct 2013
4332-v1 ASTA Low Energy Enclosure Shielding Drawings Mike Church NML
02 Apr 2013
3285-v2 Estimate of RF Cavity X-rays in the HINS Linac Enclosure and Shielding Required Bob Webber Proton Driver
HLRF
27 Jan 2009
1977-v1 MI8 Beamline Collimation Design Bruce C. Brown Transfer Lines
Collimation
22 Apr 2008
2287-v1 Mechanical Design of MI8 Collimators Bruce C. Brown et al. Transfer Lines
Collimation
22 Apr 2008
2426-v2 MARS15 Calculations for MI8 Collimator Design Bruce C. Brown et al. Transfer Lines
Collimation
Proton Plan
ES&H
22 Apr 2008
2881-v2 Main Injector Collimation System Hardware Bruce C. Brown Operations
Collimation
Proton Plan
ES&H
22 Apr 2008
336-v1 Shielding Assessment of the Main Injector Complex Chandrashekhara M. Bhat et al. Studies
19 Nov 2007
2187-v1 Specifications for the Proton Driver Injection Absorber David E. Johnson Other
Proton Driver
07 Mar 2006
2039-v1 Tritium Production in the Dolomitic Rock Adjacent to NuMI Beam Tunnels Samuel R. Childress et al. Radiation Safety
05 Dec 2005
1013-v1 Report of the Review of the BTeV Interaction Point - October 7, 2003 Michael J. Syphers CZero IR Development
11 Feb 2004
733-v1 A NUMI Wide-Band Beam Shield Design That Meets The Concentration Model Ground Water Criteria William S. Freeman ES&H
Decay Pipe
16 Jul 2003
148-v2 AP4 Beam Dump and Allowed Beam Intensity Limit During the Construction Phase of theMI-8 GeV Beam-line Chandrashekhara M. Bhat Beam Dynamics
ES&H
10 Jul 2003
673-v1 Advanced Conceptual Design of the NuMI Hadron Beam Absorber Core Valeriy I. Garkusha et al. Hadron Absorber
19 Jun 2003
342-v1 Radiation Dose Rate Measurement at Tevatron Wave Guide Penetrations at F0 Service Building due to 8 GeV Proton Beam Loss Anthony F. Leveling ES&H
05 Feb 1999
331-v2 Effect of FO Crossover Shielding Field Change Anthony F. Leveling Civil
ES&H
21 Jul 1998
315-v1 Main Injector and Recycler Ring Shielding Assessment Chandrashekhara M. Bhat et al. Studies
ES&H
01 Jul 1998
305-v2 A Preliminary Analysis of Ground-Water and Surface-Water Radioactivity Around the Main Injector Extraction and Injection Regions Chandrashekhara M. Bhat et al. Studies
ES&H
01 Nov 1997
306-v1 Can Magnetic Fields Assist in Radiation Shielding for 8 GeV Proton Beams Bruce C. Brown Energy Deposition
ES&H
ES&H
15 Aug 1997
289-v1 Main Injector 8 GeV Beam Line Shielding Assessment Chandrashekhara M. Bhat et al. Magnets
ES&H
17 Feb 1997
235-v1 Groundwater, Air-Borne and Soil Activation from the Operation of the Temporary Beam Absorber in the MI-8 GeV Beam Line Chandrashekhara M. Bhat et al. Civil
ES&H
25 Jan 1997
197-v1 8 GeV Beam Absorber for Beam Line Commissioning Chandrashekhara M. Bhat et al. Design Properties
Commissioning
ES&H
31 Jul 1996
146-v2 Radiation Level in the Intersection Region of AP2 and 8 GeV Beam-line due to Beam Loss in the AP2 Beam-line Chandrashekhara M. Bhat et al. Beam Dynamics
ES&H
23 Aug 1995
136-v2 µ-Dose Level in the Vicinity of the Intersection of the 8 GeV and the AP2-Beamlines Chandrashekhara M. Bhat Beam Dynamics
ES&H
28 Jun 1995
100-v1 Radiation Levels in the MI-60 Enclosure from Tevatron Beam Losses Chandrashekhara M. Bhat Beam Dynamics
Civil
ES&H
08 Nov 1993
95-v1 Radioactivity of the Closed Loop Cooling Water of the Main Injector Beam Abort Dump Chandrashekhara M. Bhat Design Properties
ES&H
01 Sep 1993
88-v3 Radiation Shieldings for MI Culverts Chandrashekhara M. Bhat Design Properties
Civil
ES&H
01 Aug 1993
87-v2 A Design Study of the MI40 Beam-Abort Dump Chandrashekhara M. Bhat Design Properties
ES&H
29 Jul 1993
Number of documents found: 28

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.7.23, contact Beams Document Database Administrators
Execution time: 0 wallclock secs ( 0.27 usr + 0.04 sys = 0.31 CPU)