Search Results

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

Beams-doc-# Title Author(s) Topic(s) Last Updated
742-v1 Proton Deceleration from 150 GeV to 8.9 GeV in the Main Injector: Simulations and Beam Tests Chandrashekhara M. Bhat Beam Instrumentation
Studies
LLRF
Beam Dynamics
25 Jul 2003
591-v1 BEAM BASED MEASUREMENTS OF HYSTERESIS EFFECTS IN FERMILAB MAIN INJECTOR MAGNETS Bruce C. Brown et al. Power Supplies
Magnets
07 May 2003
17-v1 RF Considerations in the Main Injector Philip S. Martin RF
17 Jan 2003
383-v1 Notes for MI/RR Group Meeting of 7 Oct 2002 Bruce C. Brown MI-RR-Group
Controls
Beam Instrumentation
Studies
BPM
14 Jan 2003
381-v1 Notes for MI/RR Group Meeting of 25 Sep 2002 Bruce C. Brown MI-RR-Group
Vacuum
Vacuum
Transfer Lines
14 Jan 2003
376-v1 A First Look at the Longitudinal Emittance in the Fermilab Recycler Ring Chandrashekhara M. Bhat Beam Dynamics
Beam Instrumentation
RF
02 Aug 2002
371-v1 Recycler Admittance Measurements Daniel R. Broemmelsiek et al. Beam Dynamics
29 Jul 2002
743-v1 Pbar Acceleration in the MI using 2.5 MHz Coalescing RF system: Tune-up Study Scheme with proton beams and Operational Implementation Chandrashekhara M. Bhat et al. RF
Beam Instrumentation
LLRF
LLRF
14 Feb 2001
356-v1 Analysis of the Beam Loss Observed During the October 12, 2000 Main Injector Deceleration Studies Gerald P. Jackson Studies
Beam Dynamics
23 Oct 2000
346-v1 Status and Issues for Main Injector Momentum and Tune Control Bruce C. Brown Controls
Power Supplies
Magnets
02 Jun 1999
334-v1 Some Additional Information for Dipole and Quadrupole Power Supply Control Bruce C. Brown Controls
Power Supplies
Magnets
04 Sep 1998
295-v1 MI Power Supply Control Issues for Magnets with Hysteresis Bruce C. Brown Power Supplies
Magnets
26 Jun 1997
115-v1 Eddy Currents in the Main Injector Dipole Magnet Coils Jean-Francois Ostiguy Magnets
22 Jul 1994
29-v1 150 GeV and Revised 120 GeV Ramps Philip S. Martin Power Supplies
06 Dec 1990
28-v1 Standard Ramps Philip S. Martin RF
Power Supplies
14 Jun 1990
Number of documents found: 15

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.7.23, contact Beams Document Database Administrators
Execution time: 0 wallclock secs ( 0.16 usr + 0.02 sys = 0.18 CPU)