Search Results

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

Beams-doc-# Title Author(s) Topic(s) Last Updated
604-v2 Increasing the Range of Recycler IBEAM James L. Crisp et al. Beam Instrumentation
22 Aug 2003
5301-v4 Achievable Aperture Improvements for the Recycler Bruce C. Brown et al. Lattice
Magnets
30 Dec 2016
5247-v1 MI8 line Beam emittance measurement Ming-jen Yang Booster
Main Injector
Recycler
06 Oct 2016
4982-v2 Aperture Implications for Recycler Assuming Full Coupling and Nominal Vertical Apertures Bruce C. Brown Lattice
Collimation
Collimation
12 May 2016
4880-v1 Magnetic Field Calculations for Recycler Magnets Bruce C. Brown et al. Magnets
Magnets
08 Jul 2015
4827-v5 XFR Modification to Resetting Beam Sync (AA) and Offset Beam Sync (OAA) Craig C Drennan Operations
LLRF
RF
LLRF
RF
LLRF
05 Jun 2015
4760-v1 Microwave Measurement of Recycler Electron Cloud, 12/19/14 Jeffrey Eldred Instabilities
Beam Instrumentation
Studies
Beam Dynamics
13 May 2015
4775-v1 Performing Vacuum Calculations Using ANSYS Kris A Anderson Vacuum
Vacuum
Vacuum
Vacuum
Vacuum
Vacuum/Water/Utilities
Vacuum
27 Feb 2015
4734-v2 E-Cloud Instability in the Recycler Alexey Burov Instabilities
Beam Dynamics
16 Jan 2015
4599-v2 Cable Mitigation at MI House 10 Elliott S McCrory et al. BPM
Beam Instrumentation
16 May 2014
4244-v1 Meeting Notes from RR BPM System -- November 1, 2012 Phil Adamson et al. BPM
BPM
Beam Instrumentation
01 Nov 2012
367-v3 Determining the Radius and Energy of the Recycler Ring Ioanis Kourbanis BPM
Beam Instrumentation
Studies
RF
17 May 2012
3974-v2 Concept: mu2e with Slow Spill from the Recycler Milorad Popovic Milorad B. Popovic Booster
Recycler
Upgrades
Project X
27 Oct 2011
2530-v2 Tune shifts in the Recycler Alexander Shemyakin Beam Dynamics
28 Sep 2011
3857-v1 Main Injector Counterwave Properties and MI300 Collimator Motion Limits Bruce C. Brown Console Applications
Lattice
Transfer Lines
Collimation
Transfer Lines
26 Apr 2011
1169-v6 Digital Receiver Based Recycler BPM Front-end Software Duane C Voy BPM
BPM
Beam Instrumentation
11 Sep 2009
3348-v1 Cooling of Hadrons at Relativistic Energies: Performance of FNAL’s Recycler Electron Cooler Lionel R. Prost Electron Cooling
30 Mar 2009
3293-v1 Reports on the development of the BETACOOL code for simulating cooling processes in the Recycler ring Alexander Smirnov et al. Beam Physics
Electron Cooling
Stochastic Cooling
Beam Dynamics
30 Jan 2009
3254-v2 Permannet Magnet Work at Fermilab 1995 to present James T. Volk Accelerator Seminar
Magnets
05 Dec 2008
3220-v2 Preparation of Accelerator Complex for Muon Physics Experiments at Fermilab Chuck Ankenbrandt et al. Antiproton Source
28 Oct 2008
3191-v2 Sextupole Feed-down effect due to counter-waves in Main Injector and Recycler Ming-jen Yang Lattice
Lattice
29 Aug 2008
3192-v1 RF Requirements for Bunching in the Recycler for Injection Into the g-2 Ring Chandrashekhara M. Bhat et al. Recycler
Beam Dynamics
28 Aug 2008
3188-v1 Extracting the effective bandwidth of the transverse stochastic cooling systems from ‘standard’ cooling rate measurements Lionel R. Prost et al. Studies
Recycler
Stochastic Cooling
20 Aug 2008
3167-v1 Cooling the Hot Momentum Beam after the Tev Shots Chandrashekhara M. Bhat et al. RF
Studies
Recycler
Beam Dynamics
27 Jul 2008
3028-v1 Recycler batch length effects on R:BEAM as measured with a Bergoz 'New Parametric Current Transformer' James L. Crisp Beam Instrumentation
Intensity Measurements
DCCTs
11 Feb 2008
2884-v2 Reconstruction of Longitudinal Phase-space by Monte Carlo Method Chandrashekhara M. Bhat RF
Recycler
Beam Dynamics
05 Oct 2007
2768-v1 Compound bucket study Chandrashekhara M. Bhat et al. Studies
Electron Cooling
Beam Dynamics
03 May 2007
2675-v1 R20 beamline optics study Ming-jen Yang Transfer Lines
05 Mar 2007
2672-v1 Results of Recycler Optics Fitting Using LOCO Alexander A. Valishev Lattice
Recycler
01 Mar 2007
2535-v1 Electron cooling at the Recycler: Update Lionel R. Prost et al. Accelerator Seminar
Electron Cooling
18 Dec 2006
2558-v1 Improvements in Momentum Mining for Tevatron Shots Chandrashekhara M. Bhat Beam Dynamics
15 Nov 2006
2355-v1 Preventing onset of beam instabilities in the e-cooled Chandrashekhara M. Bhat Beam Dynamics
20 Jul 2006
2313-v2 Strip-Mining Chandrashekhara M. Bhat et al. Beam Dynamics
29 Jun 2006
2226-v1 Proton Stacking in the Recycler Chandrashekhara M. Bhat Beam Dynamics
SNuMi
Beam Dynamics
17 Apr 2006
2178-v2 First Report of the Proton Study Group Sergei Nagaitsev et al. Operations
Other
General
Upgrades
SY120
03 Apr 2006
2209-v1 APPLICATIONS OF BARRIER –BUCKET RF SYSTEMS AT FERMILAB Chandrashekhara M. Bhat Beam Dynamics
Electromagnetic Calculations
Beam Dynamics
15 Mar 2006
2208-v1 Bunch compression and stretching using barrier rf system Chandrashekhara M. Bhat Beam Dynamics
Longitudinal Dynamics
Beam Dynamics
15 Mar 2006
2108-v1 Notes about an operation at 600 E10 level Alexander Shemyakin Operations
24 Jan 2006
745-v1 Gated Current Integrator for the Beam in the RR Barrier Bucket Chandrashekhara M. Bhat et al. RF
Beam Instrumentation
LLRF
LLRF
Beam Dynamics
13 Dec 2005
1782-v7 A 2 MegaWatt Multi-Stage Proton Accumulator Dave McGinnis Future Accelerators
03 Nov 2005
1948-v1 Model of Antiproton Stack Size Versus Rapid Transfer Time Dave McGinnis Operations
Accumulator
05 Sep 2005
1892-v1 Recycler Transverse Damper Status James L. Crisp Instabilities
BPM
BPM
Dampers
Beam Dynamics
06 Jul 2005
1886-v1 Recylcer Orbit Length Optimization, June 29 Status report Paul Lebrun Studies
Beam Dynamics
29 Jun 2005
1851-v1 ISO-ADIABATIC MERGING OF PBAR STACKS IN THE FERMILAB RECYCLER Chandrashekhara M. Bhat Longitudinal Dynamics
Alignment
Beam Dynamics
31 May 2005
1024-v3 OBSOLETE Duane C Voy Front-end Systems
Beam Instrumentation
Beam Line Tuner (BLT)
11 May 2005
1812-v1 The Recycler Commissioning Plan Sergei Nagaitsev Commissioning
06 May 2005
1795-v3 Pbar Aggregates for Fast Recycler Shots Brian E. Drendel Operations
Operations
Accumulator
03 May 2005
1747-v1 Recycler Beam Line Tuner Front-end Operation Duane C Voy Beam Instrumentation
Beam Line Tuner (BLT)
Weekly SDA meetings
22 Mar 2005
1746-v1 Harmonic analysis of selected Recycler locations using closed 3-bump orbits. Ming-jen Yang Optics
Magnets
22 Mar 2005
1601-v2 Recycler FW report at Feb 23, 2005 Instrumentation/beam physics meeting Martin J. Hu Flying Wires
Flying Wires
Instrumentation/beam Physics
11 Mar 2005
1492-v1 BPM measurements in the cooling section Alexander Shemyakin Electron Cooling
08 Dec 2004
1468-v1 Momentum Mining in the Recycler Chandrashekhara M. Bhat Longitudinal Dynamics
Beam Dynamics
22 Nov 2004
1443-v3 Operations Model: Incorporating the Recycler Elliott S McCrory Operations
12 Nov 2004
1438-v1 Barrier Bucket and Bunched Beam Cooling in the Recycler David V Neuffer Longitudinal Dynamics
Stochastic Cooling
Stochastic Cooling
09 Nov 2004
1350-v1 Electron Cooling Commissioning Plan Sergei Nagaitsev Electron Cooling
Run II
17 Sep 2004
1268-v1 Preliminary Results from Tevatron Collider Model with Assumptions on Recycler Integration Elliott S McCrory Operations
22 Jul 2004
1208-v2 Some Thoughts About June 9 Induced Instability at the Recycler Ring Kingyuen B. Ng Instabilities
Beam Dynamics
02 Jul 2004
372-v2 Calibration of the Recycler Transverse Schottky Detectors Martin J. Hu Schottky
Beam Instrumentation
ACNET
28 Jun 2004
1178-v1 Recycler BPM Calibration Application Users Guide Marc W Mengel BPM
Beam Instrumentation
25 May 2004
447-v1 OBSOLETE Duane C Voy BPM
Beam Instrumentation
18 May 2004
446-v1 OBSOLETE Duane C Voy BPM
BPM
Beam Instrumentation
18 May 2004
801-v1 OBSOLETE Duane C Voy BPM
BPM
Beam Instrumentation
Front-end Documentation
18 May 2004
800-v2 OBSOLETE Duane C Voy BPM
BPM
Front-end Documentation
Beam Instrumentation
18 May 2004
445-v1 Resonant Log Amplifier Based Recycler BPM Front-end Software Description Duane C Voy BPM
BPM
Beam Instrumentation
18 May 2004
1150-v3 Recycler transverse instability Sergei Nagaitsev Beam Dynamics
07 May 2004
1157-v1 Redefining MI 8 GeV Energy, a Proposal David E. Johnson Operations
04 May 2004
1140-v1 Redefining MI 8 GeV Energy to Maximize Pbar Production David E. Johnson Operations
Operations
23 Apr 2004
1136-v1 Recycler status (talk at UEC meeting, Apr 2004) Sergei Nagaitsev Operations
21 Apr 2004
560-v13 RR BPM channel Assignments Peter Prieto RR2003Spring
BPM
BPM
Beam Instrumentation
17 Mar 2004
1041-v1 Echotek Drivers Charles Briegel BPM
Beam Instrumentation
Tevatron BPM
BPM
24 Feb 2004
933-v2 Pbar Momentum Mining in the Recycler :simulations and beam studies Chandrashekhara M. Bhat Operations
RF
Studies
Beam Dynamics
28 Jan 2004
916-v1 RR BPM Calibration Note Stephen Pordes BPM
Beam Instrumentation
18 Nov 2003
867-v1 Recycler_BPM_Sign_Conventions Peter Prieto et al. BPM
Beam Instrumentation
06 Oct 2003
845-v1 Recycler vacuum work shutdown plan (Aug 2003) Consolato Gattuso Vacuum
24 Sep 2003
844-v1 Recycler vacuum review Aug 2003 Terry G. Anderson Vacuum
24 Sep 2003
826-v1 Recycler IPM Photos Jim Zagel Beam Instrumentation
Ion Profile Monitor
11 Sep 2003
817-v1 Recycler Vacuum Certification Requirements Lucy Nobrega Vacuum
08 Sep 2003
794-v1 Recycler Vacuum System Overview Sergei Nagaitsev Vacuum
19 Aug 2003
793-v1 Recycler Vacuum Review 2003 Sergei Nagaitsev Studies
Vacuum
Beam Dynamics
19 Aug 2003
337-v1 Another High Dispersion - Low beta Recycler Insert John A. Johnstone Lattice
Magnets
Beam Instrumentation
Beam Dynamics
14 Aug 2003
775-v0 Recycler and 8 GeV Line Permanent Magnets: Reference Design and Performance Requirements George W. Foster Magnets
Transfer Lines
11 Aug 2003
767-v1 LabVIEW VI Upgrades on the IPM Systems at Fermilab Thomas Spears Beam Instrumentation
Ion Profile Monitor
Beam Instrumentation
Beam Instrumentation
08 Aug 2003
169-v1 Recycler Pbar Transfer Lines David E. Johnson Transfer Lines
01 Aug 2003
369-v1 Longitudinal Schottky Pickup for the Recycler Edward W. Cullerton et al. Schottky
Beam Instrumentation
29 Jul 2003
181-v3 Chromaticity Adjustment System for the Recycler Stephen D. Holmes Magnets
Magnets
Beam Instrumentation
24 Jul 2003
179-v2 Magnetic Field Quality Specification for Recycler Ring Combined Function and Quadrupole Magnets Norman M. Gelfand et al. Magnets
Studies
23 Jul 2003
293-v1 Optics and Field Error Compensation in the FNAL Permanent Magnet 8.9 GeV/c Proton Transfer Line John A. Johnstone Lattice
Magnets
17 Jul 2003
322-v1 Recycler Lambertson Magnet Configurations Main Injector -- Recycler Transfer Lines David J. Harding Magnets
Magnets
Magnets
16 Jul 2003
213-v1 Main Injector and Beamline Naming Conventions David E. Johnson et al. Controls
Civil
Lattice
08 Jul 2003
198-v2 A Phase Trombone for the Recycler Ring Alper A Garren et al. Lattice
08 Jul 2003
184-v1 A Low ß, High Dispersion Insert for the Recycler Ring Norman M. Gelfand Lattice
Magnets
07 Jul 2003
144-v1 1995 Electron Cooling Spring Study Bibliography Frederick E Mills Electron Cooling
01 Jul 2003
374-v1 The Time Evolution of Beam in the Recycler Ring Krishnaswamy Gounder et al. Vacuum
Beam Dynamics
20 Jun 2003
368-v1 The Effects of Antiproton Beam Ionization: First Glance Chandrashekhara M. Bhat et al. Beam Dynamics
20 Jun 2003
378-v1 The Recycler Ring Vacuum: A Comprehensive Report Terry G. Anderson et al. Vacuum
20 Jun 2003
605-v1 MI/RR Damper George W. Foster et al. Dampers
Run II
Dampers
16 May 2003
590-v1 rrCrates_Modules.xls (aftershtdn) 4-18-03.xls John Van Bogaert RR2003Winter
Beam Instrumentation
07 May 2003
589-v1 rrCrates_Modules.xls (aftershtdn) 4-18-03.xls John Van Bogaert RR2003Winter
Beam Instrumentation
07 May 2003
572-v1 Bandpass Filter for Recycler Momentum System. Ding Sun Beam Instrumentation
Beam Dynamics
29 Apr 2003
570-v1 Design and RF Measurement Results of Schottky Pickup for Recycler and Tevatron Ding Sun Schottky
Beam Instrumentation
Instrumentation
29 Apr 2003
569-v1 Design and Measurement Results of Microwave Absorbers in Schottky Ding Sun Schottky
Beam Instrumentation
Instrumentation
29 Apr 2003
557-v9 Design for Recycler BPM Calibration Acnet Page Marc W Mengel BPM
BPM
Beam Instrumentation
Data Acquisition
15 Apr 2003
519-v2 Recycler Vacuum: Lifetime and Emittance Growth Krishnaswamy Gounder Vacuum
02 Apr 2003
531-v1 Notes for MI/RR Group Meeting of 24 March 2003 Daniel R. Broemmelsiek et al. MI-RR-Group
Studies
Dampers
25 Mar 2003
528-v1 Notes for MI/RR Group Meeting of 10 March 2003 Bruce C. Brown Extraction
MI-RR-Group
Beam Instrumentation
Vacuum
RF
24 Mar 2003
529-v1 Notes for MI/RR Group Meeting of 19 March 2003 Bruce C. Brown MI-RR-Group
Schottky
Magnets
Beam Instrumentation
Vacuum
24 Mar 2003
525-v1 RR and Transport BPM Tech Spec Bob Webber BPM
BPM
Beam Instrumentation
22 Mar 2003
520-v1 Recycler Ring Beam Lifetime: Beam-gas Interactions Krishnaswamy Gounder et al. Vacuum
Beam Dynamics
20 Mar 2003
379-v2 RECYCLER BPM SYSTEM UPGRADE Ming-jen Yang BPM
13 Jan 2003
468-v4 Notes for MI/RR Group Meeting of 19 Feb 2003 Bruce C. Brown Beam Dynamics
MI-RR-Group
Beam Instrumentation
Studies
RF
Transfer Lines
10 Mar 2003
489-v1 Notes for MI/RR Group Meeting of 5 March 2003 Terry G. Anderson et al. MI-RR-Group
Vacuum
Vacuum
10 Mar 2003
488-v1 Notes for MI/RR Group Meeting of 3 March 2003 Bruce C. Brown MI-RR-Group
RF
Vacuum
10 Mar 2003
484-v1 Notes for MI/RR Group Meeting of 26 Feb 2003 Chandrashekhara M. Bhat et al. MI-RR-Group
BPM
RF
RF
Beam Instrumentation
10 Mar 2003
469-v3 Notes for MI/RR Group Meeting of 24 Feb 2003 Bruce C. Brown MI-RR-Group
Studies
Vacuum
Transfer Lines
25 Feb 2003
457-v2 Recycler BPM Front-end 030217 Technical Review Duane C Voy BPM
BPM
Beam Instrumentation
18 Feb 2003
453-v1 A Matlab Simulation of the Proposed Recycler BPM Signal Processing Warren Schappert RR2003Winter
BPM
BPM
Beam Instrumentation
Data Acquisition
17 Feb 2003
456-v1 Notes for MI/RR Group Meeting of 12 Feb 2003 Bruce C. Brown Operations
MI-RR-Group
Vacuum
Beam Dynamics
17 Feb 2003
452-v1 Recycler Upgrade Pre-Amplifier- Transition Module Design Peter Prieto BPM
BPM
Beam Instrumentation
14 Feb 2003
435-v1 RR pbar Longitudinal Emittance during Beam stacking and Unstacking Chandrashekhara M. Bhat Beam Dynamics
13 Feb 2003
443-v1 RR BPM Meeting minutes to discuss Software Bob Webber RR BPM
BPM
BPM
Beam Instrumentation
13 Feb 2003
442-v1 RR BPM Meeting minutes to discuss Calibration System Bob Webber RR BPM
BPM
BPM
Beam Instrumentation
13 Feb 2003
441-v1 RR BPM Meeting minutes to discuss ECHOTEK DDC Signal Processing Bob Webber RR BPM
BPM
BPM
Beam Instrumentation
13 Feb 2003
440-v1 RR BPM Meeting minutes on preamps and transition modules/crates Bob Webber RR BPM
BPM
BPM
Beam Instrumentation
13 Feb 2003
439-v1 RR BPM Meeting on Schedule Development Bob Webber RR BPM
BPM
BPM
Beam Instrumentation
13 Feb 2003
438-v1 Recycler BPM Proposal - July 10, 2002 James L. Crisp et al. BPM
BPM
Beam Instrumentation
13 Feb 2003
434-v1 Notes for MI/RR Group Meeting of 10 Feb 2003 Bruce C. Brown et al. MI-RR-Group
Magnets
Beam Instrumentation
Studies
11 Feb 2003
425-v1 Recycler BPM Requirements Review - Committee Response Valeri A Lebedev et al. BPM
Beam Instrumentation
07 Feb 2003
138-v1 Requirements for the Recycler Ring and Associated Transfer Line BPMs Brajesh Choudhary BPM
BPM
Beam Instrumentation
Beam Instrumentation
07 Feb 2003
401-v1 RR BPM Functional Specification Brajesh Choudhary RR2003Spring
BPM
Beam Instrumentation
07 Feb 2003
419-v1 Thoughts On Using A Wire To Simulate Beam Through a BPM Pickup Bob Webber BPM
BPM
Beam Instrumentation
29 Jan 2003
416-v1 Notes for MI/RR Group Meeting of 22 Jan 2003 Bruce C. Brown RR2003Winter
MI-RR-Group
Other
Beam Instrumentation
Beam Instrumentation
MI2003Winter
28 Jan 2003
414-v1 Recycler Ion Clearing Field Power Supplies James A. Fitzgerald BPM
Beam Instrumentation
27 Jan 2003
407-v1 MI-60 RECYCLER AND LAB BPM MEASUREMENTS Dallas Heikkinen et al. BPM
Beam Instrumentation
27 Jan 2003
402-v1 Intrabeam Scattering in the Recycler Ring: A Fresh Look Krishnaswamy Gounder et al. Beam Dynamics
24 Jan 2003
392-v1 Notes for MI/RR Group Meeting of 08 Jan 2003 Bruce C. Brown MI-RR-Group
Studies
15 Jan 2003
390-v1 Notes for MI/RR Group Meeting of 04 Dec 2002 Bruce C. Brown MI-RR-Group
Commissioning
14 Jan 2003
389-v1 Notes for MI/RR Group Meeting of 27 Nov 2002 Bruce C. Brown MI-RR-Group
Studies
14 Jan 2003
388-v1 Notes for MI/RR Group Meeting of 18 Nov 2002 Bruce C. Brown MI-RR-Group
Commissioning
14 Jan 2003
387-v1 Notes for MI/RR Group Meeting of 6 Nov 2002 Bruce C. Brown MI-RR-Group
Commissioning
14 Jan 2003
383-v1 Notes for MI/RR Group Meeting of 7 Oct 2002 Bruce C. Brown MI-RR-Group
BPM
Beam Instrumentation
Studies
Controls
14 Jan 2003
382-v1 Notes for MI/RR Group Meeting of 30 Sep 2002 Bruce C. Brown et al. MI-RR-Group
RF
Vacuum
Studies
Vacuum
Beam Dynamics
Transfer Lines
14 Jan 2003
381-v1 Notes for MI/RR Group Meeting of 25 Sep 2002 Bruce C. Brown MI-RR-Group
Vacuum
Vacuum
Transfer Lines
14 Jan 2003
384-v1 Notes for MI/RR Group Meeting of 16 Oct 2002 Bruce C. Brown et al. Magnets
MI-RR-Group
Magnets
Studies
Stochastic Cooling
14 Jan 2003
283-v5 Notes for MI/RR Group Meeting of 18 Dec 2002 Daniel R. Broemmelsiek et al. Operations
MI-RR-Group
Studies
07 Jan 2003
284-v4 Notes for MI/RR Group Meeting of 23 Dec 2002 Bruce C. Brown et al. Beam Dynamics
MI-RR-Group
RF
Studies
Beam Dynamics
07 Jan 2003
141-v1 Software jobs for RR Flying Wire system Alberto Marchionni RR2003Winter
Beam Instrumentation
10 Dec 2002
377-v1 Transverse Beam Profile with Scraper Scans Daniel R. Broemmelsiek et al. Beam Instrumentation
Beam Dynamics
11 Oct 2002
375-v1 Vacuum Windows in Recycler Transfer Lines Carol J. Johnstone et al. Vacuum
Transfer Lines
Transfer Lines
27 Sep 2002
744-v1 Simulation of Pbar Stacking and Un-Stacking in the Recycler Ring Chandrashekhara M. Bhat Beam Dynamics
RF
Beam Instrumentation
Studies
01 Sep 2002
376-v1 A First Look at the Longitudinal Emittance in the Fermilab Recycler Ring Chandrashekhara M. Bhat RF
Beam Instrumentation
Beam Dynamics
02 Aug 2002
371-v1 Recycler Admittance Measurements Daniel R. Broemmelsiek et al. Beam Dynamics
29 Jul 2002
370-v1 Radial Position Shift Due to Synchrotron Oscillation Martin J. Hu BPM
Beam Dynamics
15 Jun 2002
702-v1 Recycler Ring Lifetime and Emittance Growth Terry G. Anderson et al. Vacuum
Stochastic Cooling
Beam Dynamics
Commissioning
08 Aug 2001
352-v1 Preparing the Proton Bunches in 2.5 MHz Buckets for MI Tune-up Chandrashekhara M. Bhat Beam Dynamics
RF
Beam Instrumentation
01 Jun 2001
366-v2 Recycler Ring Aperture Scan: Summary of Results Saeed Assadi et al. Studies
31 Dec 2000
363-v1 RQME DATA James T. Volk Magnets
20 Nov 2000
355-v1 Recycler Corrector Status David E. Johnson Alignment
09 Sep 2000
354-v1 Pbar Acceleration in the Main Injector for Run II: ESME Simulations Chandrashekhara M. Bhat et al. RF
Beam Instrumentation
Studies
26 Jul 2000
348-v1 Transverse Placement of Gradient Magnets Bruce C. Brown et al. Alignment
Magnets
Alignment
08 May 2000
345-v1 Recycler Lambertson Magnetic Design George W. Foster Magnets
Magnets
Vacuum
Transfer Lines
24 Mar 1999
329-v1 Recycler Commissioning Plan Gerald P. Jackson Studies
Commissioning
11 Nov 1998
338-v1 Recycler Quadrupole Magnetic Designs George W. Foster Magnets
Magnets
24 Sep 1998
296-v1 Mirror Magnet Designs for the Recycler Ring George W. Foster Magnets
Magnets
Transfer Lines
01 Aug 1998
315-v1 Main Injector and Recycler Ring Shielding Assessment Chandrashekhara M. Bhat et al. ES&H
Studies
01 Jul 1998
327-v1 Dispersion-Wave Generation of a High eta/sqrt(ß) Insert in the Recycler John A. Johnstone Lattice
Beam Instrumentation
Beam Dynamics
22 May 1998
328-v1 Transient Measurement of the Betatron Phase Advance Around the Recycler Ring Gerald P. Jackson Lattice
Beam Instrumentation
Controls
16 May 1998
323-v2 Beam Position Monitors for the Fermilab Recycler Ring Ed Barsotti, Jr. et al. BPM
BPM
Beam Instrumentation
29 Apr 1998
314-v1 Recycler Dump Magnet Requirements David E. Johnson et al. Magnets
Magnets
16 Feb 1998
319-v3 Recycler Magnet Alignment Offset Consolato Gattuso Alignment
Magnets
13 Feb 1998
291-v1 Analytic Results on Requirements for Recycler Gradient Magnet Longitudinal Uniformity Bruce C. Brown Lattice
Magnets
22 Jan 1998
318-v2 Magnetic Design of Recycler Ring v.18 Gradient Dipoles George W. Foster Magnets
Magnets
01 Jan 1998
313-v1 Ferrite and Compensator Symmetry Requirements for Gradient Magnets Bruce C. Brown Magnets
19 Dec 1997
311-v1 Signs of Harmonics: Permanent Quad Tuning and Skew Components of Gradient Magnets Bruce C. Brown Magnets
03 Dec 1997
312-v1 Recycler Instrumentation: Detector and Electronics Locations Gregory L. Vogel Alignment
Beam Instrumentation
01 Dec 1997
310-v1 Options for Line-of-Sight Signal Transmission of the Recycler Stochastic Cooling Systems Gerald P. Jackson Magnets
Stochastic Cooling
27 Oct 1997
297-v1 Dynamic Aperture for the Recycler Lattices RRv16 and RRv17 Norman M. Gelfand Lattice
Beam Dynamics
18 Jul 1997
285-v2 Effects of the Longitudinal Variation in the Magnetic Field in the Recycler Combined Function Magnets Norman M. Gelfand Lattice
Magnets
20 Feb 1997
287-v1 Measurements of the Longitudinal Shape and Center of the Magnetic Field of PDD Dipoles Bruce C. Brown Magnets
Magnets
Transfer Lines
17 Feb 1997
234-v1 Rectangular Combined Function Magnets Norman M. Gelfand Magnets
Magnets
28 Jan 1997
233-v2 Effect of the Measured Sextupole Moment of the Recycler Magnets on the Chromaticity and the Dynamic Aperture Norman M. Gelfand Magnets
Magnets
11 Dec 1996
232-v1 Characteristics of the RRv9 Lattice as Determined from Tracking and Calculations of the Effects of the High Order Multiple Moments Listed in MI-0170 Norman M. Gelfand Lattice
Magnets
05 Dec 1996
229-v3 Reference Orbit Trajectory in a Combined Function Magnet Stephen D. Holmes Lattice
Magnets
Beam Dynamics
05 Dec 1996
230-v2 Translating Measured Multipoles onto the Reference Orbit in Recycler Combined Function Magnet Stephen D. Holmes Magnets
Magnets
05 Dec 1996
227-v1 Rogowski Coil Measurements of PQP003 and PQP004 Bruce C. Brown et al. Magnets
Magnets
Transfer Lines
25 Nov 1996
228-v1 Mechanical and Magnetic Tolerances in Recycler Prototype Magnets George W. Foster Magnets
20 Nov 1996
200-v1 Mass Separation in a Proton Analog of a 5 MeV Electron Beam Kirt J. Bertsche Beam Instrumentation
Electron Cooling
Electron Cooling
01 Aug 1996
196-v3 Evaluation of Resonance Widths from Recycler Magnetic Field Multipoles for Recycler Lattice RRV7 Stephen D. Holmes Lattice
Alignment
Magnets
31 Jul 1996
116-v1 Permanent Magnet Stability Jean-Francois Ostiguy Magnets
Magnets
14 Jun 1996
187-v1 Recycler Lattice (rrv6.) Sho Ohnuma Lattice
01 Jun 1996
182-v1 A Possible Strategy for Recycler Orbit Correction Stephen D. Holmes Magnets
Beam Instrumentation
26 Apr 1996
180-v1 Impedances and Beam Stability Issues of the Fermilab Recycler Ring Kingyuen B. Ng Instabilities
Beam Dynamics
18 Apr 1996
176-v1 Betatron Cooling for the Recycler John P. Marriner Stochastic Cooling
Beam Dynamics
10 Apr 1996
175-v1 Filter Momentum Cooling for the Recycler John P. Marriner Stochastic Cooling
Beam Dynamics
05 Apr 1996
173-v2 Evaluation of Resonance Widths from Recycler Magnetic Field Multipoles Stephen D. Holmes Optics
Lattice
Magnets
Studies
03 Apr 1996
170-v1 Closed Orbit Effects Due to Longitudinal Bend Center Displacement Bruce C. Brown Alignment
Transfer Lines
Transfer Lines
02 Apr 1996
158-v2 Recycler Beta Function Distortions from Systematic and Random Gradient Errors in Combined Function and Quadrupole Magnets Stephen D. Holmes et al. Lattice
Magnets
02 Apr 1996
174-v1 Momentum Stacking in the Recycler John P. Marriner Beam Dynamics
01 Apr 1996
172-v1 Stochastic Cooling of the Recycler Antiproton Stack Momentum Spread Including Intrabeam Scattering and Barrier Buckets Gerald P. Jackson Stochastic Cooling
29 Mar 1996
156-v1 Recycler Closed Orbit Distortion Expected from Random Magnetic Element Strength and Alignment Errors Stephen D. Holmes Alignment
Magnets
04 Mar 1996
155-v2 Recycler Closed Orbit Distortion from a Systematic Mismatch Between Long and Short Combined Function Magnet Strengths Stephen D. Holmes et al. Magnets
29 Feb 1996
154-v2 Transverse Schottky Detector for Antiproton Recycle Ring Ping J. Chou Beam Instrumentation
18 Dec 1995
145-v2 Outline of the 5 MeV Electron Test Beam Project Gerald P. Jackson Electron Cooling
Electron Cooling
21 Aug 1995
143-v1 Design Specifications for the 90o Dipoles for the Recycler Ring Electron Cooling Beamline Gerald P. Jackson Magnets
Magnets
Electron Cooling
14 Aug 1995
133-v1 Recycler Ring Lattice Design with Combined Function Magnets David E. Johnson Lattice
Magnets
03 Mar 1995
132-v2 High Beta Insert for MI-like Ring David E. Johnson Optics
Lattice
22 Feb 1995
Number of documents found: 205

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.7.23, contact Beams Document Database Administrators
Execution time: 2 wallclock secs ( 0.54 usr + 0.13 sys = 0.67 CPU)