Beams-doc-# Title Author(s) Topic(s) Last Updated
4046-v3 Activation of Steel and Copper Samples in the Main Injector Collimator Region Bruce C. Brown Energy Deposition
Collimation
ES&H
01 Jun 2017
4679-v1 Total Loss Monitor Radiation Safety System Anthony F. Leveling Muon
Accelerator Seminar
Booster
08 Oct 2014
3505-v1 HINS MDB Ion Source Safety Documents Roger Dixon et al. Project X
Linac
23 Nov 2009
3219-v1 Analysis of Some Crude Main Injector Radiation Cool-down Data Bruce C. Brown Operations
ES&H
03 Oct 2008
2426-v2 MARS15 Calculations for MI8 Collimator Design Bruce C. Brown et al. Transfer Lines
Collimation
Proton Plan
ES&H
22 Apr 2008
336-v1 Shielding Assessment of the Main Injector Complex Chandrashekhara M. Bhat et al. Studies
19 Nov 2007
2614-v1 HINS Test Facility at Meson System Overview of Hazards Jim Steimel Proton Driver
12 Jan 2007
2613-v1 HINS Test Facility at Meson Non-Ionizing Radiation Safety System Jim Steimel Proton Driver
HLRF
12 Jan 2007
935-v2 Safety System Overview Mark T. Obrycki Adv. Accelerator R&D
17 Dec 2003
148-v2 AP4 Beam Dump and Allowed Beam Intensity Limit During the Construction Phase of theMI-8 GeV Beam-line Chandrashekhara M. Bhat Beam Dynamics
ES&H
10 Jul 2003
105-v1 Radiation Levels in the 8 GeV Beamline Arising from the Tevatron Beam Losses Chandrashekhara M. Bhat et al. ES&H
24 Jun 2003
332-v1 Determination of Interlock Gate Locations at E35, F47, and A25 Anthony F. Leveling Studies
Civil
ES&H
15 Sep 1998
330-v1 Committed Effective Dose Equivalent Calculation for Personnel Exposure to Airborne Radioactivity Produced by Main Injector Beam Loss Anthony F. Leveling Studies
ES&H
07 Jul 1998
315-v1 Main Injector and Recycler Ring Shielding Assessment Chandrashekhara M. Bhat et al. Studies
ES&H
01 Jul 1998
309-v2 Ground Water, Air-Borne and Soil Activation from the Operation of the MI-40 Beam Absorber During the FMI Era Chandrashekhara M. Bhat ES&H
01 Dec 1997
305-v2 A Preliminary Analysis of Ground-Water and Surface-Water Radioactivity Around the Main Injector Extraction and Injection Regions Chandrashekhara M. Bhat et al. Studies
ES&H
01 Nov 1997
289-v1 Main Injector 8 GeV Beam Line Shielding Assessment Chandrashekhara M. Bhat et al. Magnets
ES&H
17 Feb 1997
235-v1 Groundwater, Air-Borne and Soil Activation from the Operation of the Temporary Beam Absorber in the MI-8 GeV Beam Line Chandrashekhara M. Bhat et al. Civil
ES&H
25 Jan 1997
211-v2 Ground-water Activation from the Operation of MI40 Beam Absorber Chandrashekhara M. Bhat et al. Design Properties
ES&H
28 Aug 1996
146-v2 Radiation Level in the Intersection Region of AP2 and 8 GeV Beam-line due to Beam Loss in the AP2 Beam-line Chandrashekhara M. Bhat et al. Beam Dynamics
ES&H
23 Aug 1995
136-v2 µ-Dose Level in the Vicinity of the Intersection of the 8 GeV and the AP2-Beamlines Chandrashekhara M. Bhat Beam Dynamics
ES&H
28 Jun 1995
100-v1 Radiation Levels in the MI-60 Enclosure from Tevatron Beam Losses Chandrashekhara M. Bhat Beam Dynamics
Civil
ES&H
08 Nov 1993
95-v1 Radioactivity of the Closed Loop Cooling Water of the Main Injector Beam Abort Dump Chandrashekhara M. Bhat Design Properties
ES&H
01 Sep 1993
88-v3 Radiation Shieldings for MI Culverts Chandrashekhara M. Bhat Design Properties
Civil
ES&H
01 Aug 1993
87-v2 A Design Study of the MI40 Beam-Abort Dump Chandrashekhara M. Bhat Design Properties
ES&H
29 Jul 1993
68-v1 Conceptual Design Report of Vacuum Pumping System for Main Injector Shuxiu Zhang Vacuum
Vacuum
30 Dec 1991
Number of documents found: 26

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.7.23, contact Beams Document Database Administrators
Execution time: 1 wallclock secs ( 0.28 usr + 0.04 sys = 0.32 CPU)