Search Results

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

Beams-doc-# Title Author(s) Topic(s) Last Updated
4046-v3 Activation of Steel and Copper Samples in the Main Injector Collimator Region Bruce C. Brown Energy Deposition
Collimation
ES&H
01 Jun 2017
4493-v1 Ultra High Input Impedance Electrometer/Pulse Train Converter For the Measurement of Beam Losses Dan Schoo Mu2e
04 Dec 2013
4129-v2 Shielding Assessment for Electron Gun Commissioning at the New Muon Lab Mike Church Egun
25 Sep 2012
3732-v1 Linac and Booster Radiation Shielding Status, Plans and Constraints John E Anderson Linac
Booster
ES&H
ES&H
08 Dec 2010
3734-v2 BOOSTER COLLIMATION AND SHIELDING Nikolai Mokhov Energy Deposition
Upgrades
07 Dec 2010
3576-v2 Radiation Shielding Tests for Laser Power Supply David E. Johnson Project X
Beam Instrumentation
18 Mar 2010
3502-v1 HINS Shielding/Dose Calculation with Shielding Cracks Nikolai Mokhov Energy Deposition
Project X
Proton Driver
19 Nov 2009
622-v1 FERMILAB BOOSTER BEAM COLLIMATION AND SHIELDING Alexandr Drozhdin et al. Energy Deposition
Upgrades
02 Jun 2008
2287-v1 Mechanical Design of MI8 Collimators Bruce C. Brown et al. Transfer Lines
Collimation
22 Apr 2008
336-v1 Shielding Assessment of the Main Injector Complex Chandrashekhara M. Bhat et al. Studies
19 Nov 2007
2598-v3 Estimate of X-Ray Shielding and Radiation Monitoring for Safe Operation of the HINS Cavity Test Cave in the Meson Detector Building Bob Webber Proton Driver
HLRF
16 Jan 2007
673-v1 Advanced Conceptual Design of the NuMI Hadron Beam Absorber Core Valeriy I. Garkusha et al. Hadron Absorber
19 Jun 2003
331-v2 Effect of FO Crossover Shielding Field Change Anthony F. Leveling Civil
ES&H
21 Jul 1998
315-v1 Main Injector and Recycler Ring Shielding Assessment Chandrashekhara M. Bhat et al. Studies
ES&H
01 Jul 1998
307-v2 Shielding Assessment of F0 to Switchyard Beam Line Enclosure for MI 120 GeV Beam Transport Chandrashekhara M. Bhat Transfer Lines
Beam Dynamics
ES&H
16 Sep 1997
289-v1 Main Injector 8 GeV Beam Line Shielding Assessment Chandrashekhara M. Bhat et al. Magnets
ES&H
17 Feb 1997
211-v2 Ground-water Activation from the Operation of MI40 Beam Absorber Chandrashekhara M. Bhat et al. Design Properties
ES&H
28 Aug 1996
197-v1 8 GeV Beam Absorber for Beam Line Commissioning Chandrashekhara M. Bhat et al. Design Properties
Commissioning
ES&H
31 Jul 1996
88-v3 Radiation Shieldings for MI Culverts Chandrashekhara M. Bhat Design Properties
Civil
ES&H
01 Aug 1993
700-v1 Sloping the Main Injector Philip S. Martin Design Properties
Civil
22 Jun 1990
Number of documents found: 20

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.7.23, contact Beams Document Database Administrators
Execution time: 1 wallclock secs ( 0.27 usr + 0.05 sys = 0.32 CPU)