Search Results

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

Beams-doc-# Title Author(s) Topic(s) Last Updated
5344-v6 Booster Vrf by fsy Measurements at Injection Energy (400 MeV on a DC-Mode) Chandrashekhara M. Bhat LLRF
Beam Physics
HLRF
22 Mar 2017
4872-v2 The LHC in Context and the Current Status Chandrashekhara M. Bhat Other
News
Other
27 Jun 2015
3400-v1 A Hybrid Design of Project-X Weiren Chou Project X
Linac
21 May 2009
1390-v3 Abort Gap Monitoring Utilizing Synchrotron Light Randy M Thurman-Keup SyncLite (SL)
Instrumentation
Abort Gap Measurements
19 Feb 2008
3023-v1 Advanced Accelerator R&D at the A0 Photoinjector Raymond P Fliller Diagnostics
Photoinjector
Experiments
06 Feb 2008
1975-v2 Optical Imaging of the Tevatron Beam using Synchrotron Radiation Randy M Thurman-Keup SyncLite (SL)
Emittance
Instrumentation
29 Jan 2008
1544-v2 Synclite Status Randy M Thurman-Keup SyncLite (SL)
Instrumentation
05 Jul 2005
1460-v1 Status of Synclite Randy M Thurman-Keup SyncLite (SL)
Instrumentation/beam Physics
Instrumentation
Abort Gap Measurements
17 Nov 2004
1195-v1 Abort Gap Synch Light Results from 6/4/04 TeV Meeting Randy M Thurman-Keup SyncLite (SL)
Instrumentation
04 Jun 2004
1194-v1 Abort Gap Synch Light results from 5/28/04 TeV Meeting Randy M Thurman-Keup SyncLite (SL)
Instrumentation
04 Jun 2004
418-v2 synchlight rates vs particle energy Alan A. Hahn SyncLite (SL)
Emittance
25 Mar 2004
838-v1 Update of Snapshot of Tevatron Flying Wire and Synchrotron Light Detector Transverse Emittance Measurements at 980GeV Krzysztof Genser SyncLite (SL)
Emittance
Flying Wires
Instrumentation
Flying Wires
19 Sep 2003
369-v1 Longitudinal Schottky Pickup for the Recycler Edward W. Cullerton et al. Beam Instrumentation
Schottky
29 Jul 2003
656-v1 A Snapshot of Tevatron Flying Wire and Synchrotron Light Detector Transverse Emittance Measurements at 980GeV Krzysztof Genser SyncLite (SL)
Emittance
Flying Wires
Instrumentation
Flying Wires
05 Jun 2003
630-v1 An 8-GeV Synchrotron-Based Proton Driver Weiren Chou Upgrades
Upgrades
Future Accelerators
28 May 2003
415-v1 synclight box pictures Harry Cheung et al. SyncLite (SL)
Alignment
Emittance
27 Jan 2003
370-v1 Radial Position Shift Due to Synchrotron Oscillation Martin J. Hu Beam Dynamics
BPM
15 Jun 2002
Number of documents found: 17

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.8.9, contact Beams Document Database Administrators
Execution time: 1 wallclock secs ( 0.17 usr + 0.04 sys = 0.21 CPU)