Search Results

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

Beams-doc-# Title Author(s) Topic(s) Last Updated
1390-v3 Abort Gap Monitoring Utilizing Synchrotron Light Randy M Thurman-Keup SyncLite (SL)
Instrumentation
Abort Gap Measurements
19 Feb 2008
1738-v3 Sync Light ACNET Parameters Eugene Lorman et al. SyncLite (SL)
Instrumentation
29 Jan 2008
1098-v4 Synclite & AGI Harware Setup Eugene Lorman et al. SyncLite (SL)
Instrumentation
Abort Gap Measurements
29 Jan 2008
1086-v1 Sync Light ACNET Parameters Willem Blokland et al. SyncLite (SL)
Instrumentation
25 Mar 2004
912-v1 Pictures of LBNL Photodiode Light Beam Position Detector in Synclight Box. John Byrd et al. SyncLite (SL)
12 Nov 2003
911-v1 Pictures of Synclight Shutter installed 11/7/03 Stephen Pordes SyncLite (SL)
12 Nov 2003
215-v1 Bumping the orbit to calibrate the SyncLite 2 scale Harry Cheung SyncLite (SL)
Beam Studies
13 Dec 2002
186-v1 Results from a prototype beam monitor in the Tevatron using synchrotron light Alan A. Hahn et al. SyncLite (SL)
12 Dec 2002
185-v1 Results from an imaging beam monitor in the Tevatron using synchrotron light Alan A. Hahn et al. SyncLite (SL)
12 Dec 2002
Number of documents found: 9

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.8.9, contact Beams Document Database Administrators
Execution time: 1 wallclock secs ( 0.16 usr + 0.02 sys = 0.18 CPU)