Search Results

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

Beams-doc-# Title Author(s) Topic(s) Last Updated
1262-v5 Synchrotron Light Monitor Front End Description Eugene Lorman et al. SyncLite (SL)
Instrumentation
29 Feb 2008
1390-v3 Abort Gap Monitoring Utilizing Synchrotron Light Randy M Thurman-Keup SyncLite (SL)
Instrumentation
Abort Gap Measurements
19 Feb 2008
1975-v2 Optical Imaging of the Tevatron Beam using Synchrotron Radiation Randy M Thurman-Keup SyncLite (SL)
Emittance
Instrumentation
29 Jan 2008
1098-v4 Synclite & AGI Harware Setup Eugene Lorman et al. SyncLite (SL)
Instrumentation
Abort Gap Measurements
29 Jan 2008
2537-v4 Synclite Master Document Randy M Thurman-Keup SyncLite (SL)
Instrumentation
25 Oct 2006
2519-v1 AGI Status Randy M Thurman-Keup SyncLite (SL)
Emittance
Instrumentation
Tevatron Group
Abort Gap Measurements
13 Oct 2006
2165-v1 Monitoring Abort Gap Beam Intensity in the Tevatron Using Synchrotron Radiation Randy M Thurman-Keup SyncLite (SL)
Instrumentation
Abort Gap Measurements
22 Feb 2006
1974-v1 Synclite Status 9/28/2005 Randy M Thurman-Keup SyncLite (SL)
Instrumentation
30 Sep 2005
1973-v1 A Controls Java-Based Synclite Viewer Application Randy M Thurman-Keup SyncLite (SL)
Instrumentation
29 Sep 2005
1544-v2 Synclite Status Randy M Thurman-Keup SyncLite (SL)
Instrumentation
05 Jul 2005
1759-v1 Synclite Status from 03/25/05 TeV Mtg Randy M Thurman-Keup SyncLite (SL)
Instrumentation
Tevatron Group
28 Mar 2005
1460-v1 Status of Synclite Randy M Thurman-Keup SyncLite (SL)
Instrumentation/beam Physics
Instrumentation
Abort Gap Measurements
17 Nov 2004
418-v2 synchlight rates vs particle energy Alan A. Hahn SyncLite (SL)
Emittance
25 Mar 2004
912-v1 Pictures of LBNL Photodiode Light Beam Position Detector in Synclight Box. John Byrd et al. SyncLite (SL)
12 Nov 2003
911-v1 Pictures of Synclight Shutter installed 11/7/03 Stephen Pordes SyncLite (SL)
12 Nov 2003
587-v3 Performance of a Beam Monitor in the Fermilab Tevatron Using Synchrotron Light Harry Cheung et al. SyncLite (SL)
03 Aug 2003
579-v1 Synclite Abort Gap Study II Harry Cheung SyncLite (SL)
Beam Studies
Meeting Minutes
Instrumentation
Tevatron Group
29 Apr 2003
459-v1 Second Beam Orbit Study to Calibrate the Synclite Scale Harry Cheung SyncLite (SL)
31 Mar 2003
534-v1 Abort gap synclite study Harry Cheung SyncLite (SL)
Tevatron Group
28 Mar 2003
466-v1 Studies for the Synclite Scale Harry Cheung et al. SyncLite (SL)
24 Feb 2003
455-v1 Manuals for Avtech pulser used for Synclite Harry Cheung SyncLite (SL)
17 Feb 2003
451-v1 Synclite - A Transverse Beam Profile Monitor Harry Cheung SyncLite (SL)
14 Feb 2003
417-v1 synclight geometry Andreas Jansson SyncLite (SL)
Emittance
28 Jan 2003
415-v1 synclight box pictures Harry Cheung et al. SyncLite (SL)
Alignment
Emittance
27 Jan 2003
215-v1 Bumping the orbit to calibrate the SyncLite 2 scale Harry Cheung SyncLite (SL)
Beam Studies
13 Dec 2002
Number of documents found: 25

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.8.9, contact Beams Document Database Administrators
Execution time: 0 wallclock secs ( 0.19 usr + 0.04 sys = 0.23 CPU)