Beams-doc-# Title Author(s) Topic(s) Last Updated
5359-v2 The Sinuous Target Robert M Zwaska Future Accelerators
Beam Physics
Magnets
31 Mar 2017
5355-v1 The Challenges of Next Generation Neutrino Beam Targetry Patrick G. Hurh et al. Target Hall Systems
NOvA
NuMI
23 Mar 2017
4039-v1 Optimization of g-2 target Sergei I. Striganov External Beams
Antiproton Source
24 Apr 2012
3516-v1 Project X and a Muon Facility at Fermilab Milorad B. Popovic Upgrades
Project X
07 Dec 2009
2198-v1 Beam collimation in the Main Injector Bruce C. Brown et al. Project
Collimation
02 Jun 2008
2953-v1 Recent Operating Experience at Antiproton Source Target Station Anthony F. Leveling Target Station
06 Dec 2007
2405-v1 SNuMI Report (on target pile cooling)- August 7 2006. Andy Stefanik SNuMi
22 Aug 2006
2392-v1 Target and Horn Configuration for SNuMI, NOvA, and MINERvA Michael A. Martens SNuMi
15 Aug 2006
1742-v3 Antiproton Source Target Rotation Motor Controller David W. Peterson et al. Target Station
07 Aug 2006
1242-v2 Potential Optical Solutions For Pbar Stacking and SY120 Mixed-Mode Operation David E. Johnson SY120
07 Jul 2004
724-v1 Optimization Studies of Beam Optics for the Low Energy Neutrino Production Valeriy I. Garkusha et al. Target Hall Systems
Focusing Horns
09 Jan 2004
730-v1 Proposal for Continuously-Variable Beam Energy Deborah Harris et al. Target Hall Systems
15 Jul 2003
729-v1 Technical Design of the Target Pile Protection Baffle Valeriy I. Garkusha et al. Target Hall Systems
14 Jul 2003
723-v1 Further Studies of Target for the Low Energy NuMI Beam Valeriy I. Garkusha et al. Target Hall Systems
09 Jul 2003
716-v1 Preliminary Design Work and Neutrino Beam Calculations for the NuMI Project Valeriy I. Garkusha et al. Target Hall Systems
Focusing Horns
08 Jul 2003
715-v1 Conceptual Design Work and Neutrino Beam Calculations for the NuMI Project Valeriy I. Garkusha et al. Target Hall Systems
Focusing Horns
08 Jul 2003
714-v1 Preliminary Design Work on NBB Absorber and Target Prototype Valeriy I. Garkusha et al. Target Hall Systems
07 Jul 2003
712-v1 Monitoring NuMI Target Alex V. Kulik Target Hall Systems
07 Jul 2003
711-v1 Advanced Conceptual Design of the Full-Scale Fin Target and Engineering Design of the Target Prototypes for the NuMI Project Valeriy I. Garkusha et al. Target Hall Systems
General
03 Jul 2003
706-v1 Advanced Conceptual Design of the Low Energy Target and Beam Plug Valeriy I. Garkusha et al. Target Hall Systems
03 Jul 2003
707-v1 Comparison of Initial Conceptual Designs of the Low Energy Target Valeriy I. Garkusha et al. Target Hall Systems
03 Jul 2003
709-v1 Proposed Test of NuMI Prototype Target in Main Injector Beam Valeriy I. Garkusha et al. Target Hall Systems
03 Jul 2003
685-v1 Pre-engineering Design for the Technical Components of the NuMI Beams Valeriy I. Garkusha et al. General
23 Jun 2003
676-v1 Dynamic Stress Calculations for ME and LE Targets and Results of Prototyping for the LE Target Valeriy I. Garkusha et al. Target Hall Systems
20 Jun 2003
843-v1 Temperature and Stresses in the LE Target with 6.4 mm Wide Segments Valeriy I. Garkusha et al. Target Hall Systems
20 Jun 2001
347-v1 Single Turn Extraction Design for NuMI David E. Johnson Extraction
Extraction from Main Injector
Design Properties
Civil
Civil Construction
06 Jan 2000
333-v2 Main Injector Commissioning Plan C. Shekhar Mishra Beam Instrumentation
Operations
Commissioning
22 Jul 1998
197-v1 8 GeV Beam Absorber for Beam Line Commissioning Chandrashekhara M. Bhat et al. Design Properties
Commissioning
ES&H
31 Jul 1996
Number of documents found: 28

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.7.23, contact Beams Document Database Administrators
Execution time: 0 wallclock secs ( 0.20 usr + 0.02 sys = 0.22 CPU)