Search Results

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

Beams-doc-# Title Author(s) Topic(s) Last Updated
6306-v6 Booster Upgrades to Achieve ~MW Beam in the Fermilab Complex Chandrashekhara M. Bhat Booster
10 May 2018
4363-v2 Plans for Booster & Linac Transformer Installation Ryan Crawford Booster
Upgrades
Upgrades
PIP
Linac
08 May 2013
4334-v1 Linac Modulator Upgrade Trevor A Butler Upgrades
PIP
Linac
03 Apr 2013
4312-v1 Booster Ferrite Bias Supply Upgrade Patrick G. Sheahan Booster
HLRF
Upgrades
PIP
13 Mar 2013
4301-v1 Booster Beam Notching Installation Update Salah Chaurize Booster
Beam Dynamics
Upgrades
PIP
25 Feb 2013
4266-v1 Refurbished Booster RF John S Reid Booster
HLRF
Upgrades
PIP
21 Dec 2012
4228-v1 Linac MCC/Transformer, Hatch, Booster Transformers, Anode Supply Ryan Crawford Booster
Upgrades
Upgrades
PIP
Linac
25 Sep 2012
4210-v1 RFQ PA Systems Brian Schupbach Pre-Accelerator
Upgrades
PIP
30 Aug 2012
4199-v1 Booster Turbo Manifold Design Analysis David Augustine Booster
Vacuum
Upgrades
PIP
21 Aug 2012
4195-v1 Linac Substation L1 & Booster Substation Y-BE2 --- Update #3 Ryan Crawford Booster
Upgrades
Upgrades
PIP
Linac
15 Aug 2012
4167-v2 PIP - Linac: Substation L1 & MCC Upgrade Ryan Crawford PIP
Linac
27 Jun 2012
4155-v1 PIP - Linac: BPM Readout Upgrade - Status Report Nathan Eddy Upgrades
Beam Instrumentation
Linac
12 Jun 2012
4097-v1 PIP - Linac: 200MHz Modulator Upgrade - Status Report Trevor A Butler Upgrades
PIP
Linac
21 Mar 2012
4096-v1 PIP - Linac: Substation L1 & MCC Upgrade Ryan Crawford Upgrades
PIP
Linac
20 Mar 2012
4007-v3 Linac L1 Substation Upgrade Steven L. Hays Upgrades
PIP
23 Nov 2011
3734-v2 BOOSTER COLLIMATION AND SHIELDING Nikolai Mokhov Energy Deposition
Upgrades
07 Dec 2010
3428-v1 Fermilab Low Energy Linac Low Level RF Upgrade Engineering Notes and Operational Guide Edward W. Cullerton et al. LLRF
LLRF
13 Aug 2009
3269-v1 A 750 keV RFQ for the Fermilab Linac Milorad B. Popovic Pre-Accelerator
Upgrades
Linac
17 Dec 2008
3268-v2 Creating and Accelerating Flat Bunches in the LHC Chandrashekhara M. Bhat Upgrades
15 Dec 2008
921-v1 Linac Upgrade Scenarios 2003 Elliott S McCrory Upgrades
21 Nov 2003
629-v1 2 MW Upgrade of the Fermilab Main Injector Weiren Chou Future Accelerators
Project
28 May 2003
472-v2 REQUIREMENTS FOR THE MAIN INJECTOR & ASSOCIATED TRANSFER LINES BPMs INCLUDING THE NuMI BEAM LINE Brajesh Choudhary Beam Instrumentation
BPM
04 Mar 2003
471-v1 MAIN INJECTOR BPM SYSTEM UPGRADE + NUMI BEAMLINE BPM REQUIREMENTS Brajesh Choudhary Beam Instrumentation
BPM
03 Mar 2003
Number of documents found: 23

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.8.9, contact Beams Document Database Administrators
Execution time: 1 wallclock secs ( 0.20 usr + 0.04 sys = 0.24 CPU)