Beams Document 1780-v1

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

Proton and PBar Beam Measurements in the Main Injector

Document #:
Beams-doc-1780-v1
Document type:
Note
Submitted by:
Steve Wolbers
Updated by:
Steve Wolbers
Document Created:
13 Apr 2005, 15:19
Contents Revised:
13 Apr 2005, 15:19
Metadata Revised:
13 Apr 2005, 15:19
Viewable by:
  • Public document
Modifiable by:

Quick Links:
Latest Version

Abstract:
Measurements were made of the size of signals near 2.5MHz and 53MHz from a pickup from one of the Main Injector BPMs. These are to be used to help characterize and design the upgrade of the MI BPMs.
Files in Document:
DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.8.9, contact Beams Document Database Administrators