Beams Document 1782-v5

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

A 2 MegaWatt Multi-Stage Proton Accumulator

Document #:
Beams-doc-1782-v5
Document type:
Talk
Submitted by:
Dave McGinnis
Updated by:
Dave McGinnis
Document Created:
20 Apr 2005, 11:23
Contents Revised:
16 Sep 2005, 20:34
Metadata Revised:
16 Sep 2005, 20:38
Viewable by:
  • Public document
Modifiable by:

Quick Links:
Latest Version

Other Versions:
Beams-doc-1782-v7
03 Nov 2005, 08:08
Beams-doc-1782-v6
29 Sep 2005, 12:34
Beams-doc-1782-v4
22 May 2005, 21:23
Beams-doc-1782-v3
25 Apr 2005, 14:14
Beams-doc-1782-v2
22 Apr 2005, 21:31
Beams-doc-1782-v1
20 Apr 2005, 11:23
Abstract:
A large increase in proton intensity is possible after the collider program concludes because the present antiproton production complex can be converted into a multi-stage proton accumulator for injection into the Main Injector. This accumulator would have three major components, each re-using or replacing existing machines:
• The Accumulator ring as a RF momentum stacker.
• The Recycler ring as a box-car stacker.
• The Debuncher ring would be replaced with a wide aperture booster.
Files in Document:
Other Files:
DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.8.9, contact Beams Document Database Administrators