Antiproton Beam Position Measurements with Prototype Equipment at MI-30

Document #:
Beams-doc-1958-v2
Document type:
Note
Submitted by:
Bob Webber
Updated by:
Bob Webber
Document Created:
16 Sep 2005, 17:11
Contents Revised:
19 Sep 2005, 14:24
DB Info Revised:
19 Sep 2005, 14:24
Viewable by:
  • Public document
Modifiable by:
Other Versions:
Beams-doc-1958-v1
16 Sep 2005, 17:11
Abstract:
A look at pbars in MI during shots to Recycler, Friday, Sept. 16. Analog signals were processed in prototype MI BPM transition board. Transition board outputs were split into two EchoTeks, although during these tests one of the signals to the second EchoTek board was connected instead to the oscilloscope. Fast time plots of reported position and BPM sum signal. Scope data of signals at EchoTek board input.