Beams Document 2135-v2

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

Current Proton Driver Activities in the Accelerator Division

Document #:
Beams-doc-2135-v2
Document type:
Talk
Submitted by:
Milorad B. Popovic
Updated by:
Milorad B. Popovic
Document Created:
03 Feb 2006, 08:42
Contents Revised:
28 Feb 2006, 13:02
Metadata Revised:
28 Feb 2006, 13:02
Viewable by:
  • Public document
Modifiable by:

Quick Links:
Latest Version

Other Versions:
Beams-doc-2135-v1
03 Feb 2006, 08:42
Abstract:
A brief overview of the current design of the Proton Driver 8 GeV Superconducting Linac will be presented. Plans for building and testing the front-end of this machine in the Meson Detector Building will be described. Active work within the Accelerator Division will be highlighted including high power RF vector modulator development, design of the Main Injector injection system, beam simulations, and klystron modulator construction.
Files in Document:
Authors:
Keywords:
ProtonDriver Meson
DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.8.9, contact Beams Document Database Administrators