Beams Document 2288-v1

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

MIBPM Cable Measurements

Document #:
Beams-doc-2288-v1
Document type:
Note
Submitted by:
Bob Webber
Updated by:
Bob Webber
Document Created:
05 Jun 2006, 14:37
Contents Revised:
05 Jun 2006, 14:37
Metadata Revised:
05 Jun 2006, 14:48
Viewable by:
  • Public document
Modifiable by:

Quick Links:
Latest Version

Abstract:
As a part of the Main Injector BPM system upgrade and to quantify system errors that can lead to reporting incorrect beam positions, signal transmission measurements were made on each of the Main Injector tunnel-to-service building BPM cable pairs. Measurements were done with 2.5 MHz and with 52.8 MHz test signals. Results and analyses of the measurements are described and gain correction factors for use in beam position computations are provided.
Files in Document:
Authors:
DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.8.9, contact Beams Document Database Administrators