Beams Document 2470-v1

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

Run II Status and Goals: Can We Achieve 8 fb-1

Document #:
Beams-doc-2470-v1
Document type:
Talk
Submitted by:
Valeri A Lebedev
Updated by:
Valeri A Lebedev
Document Created:
25 Sep 2006, 10:30
Contents Revised:
25 Sep 2006, 10:30
Metadata Revised:
25 Sep 2006, 10:30
Viewable by:
  • Public document
Modifiable by:

Quick Links:
Latest Version

Abstract:
Present status of Run II program and further development aimed to achieve the planned Run II luminosity integral will be discussed. Recent machine performance assures us that we can achieve 4-5 fb-1 of integrated luminosity by the end of FY-2009 with minimum development. However the upgrade path we are currently pursuing should allow us to achieve 7-8 fb-1. Major contributions should come from increase of stacking rate in Antiproton source, fast and more efficient Accumulator-to-Recycler transfers and improvements in Tevatron.
Files in Document:
  • PDF file (RunIISep2006Presentation.pdf, 3.3 MB)
Keywords:
luminosity
DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.8.9, contact Beams Document Database Administrators