Beams Document 2825-v2

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

Correcting the Accumulator Extraction Energy and Phase

Document #:
Beams-doc-2825-v2
Document type:
Note
Submitted by:
Steve Werkema
Updated by:
Steve Werkema
Document Created:
27 Jun 2007, 11:36
Contents Revised:
04 Jun 2008, 16:25
Metadata Revised:
04 Jun 2008, 16:25
Viewable by:
  • Public document
Modifiable by:

Quick Links:
Latest Version

Other Versions:
Beams-doc-2825-v4
28 Jul 2008, 14:51
Beams-doc-2825-v3
28 Jul 2008, 10:51
Beams-doc-2825-v1
27 Jun 2007, 11:36
Abstract:
This document contains the procedures for correcting the Accumulator - Main Injector energy and RF phase match for pbar transfers to the Recycler from the Accumulator.
Files in Document:
  • pdf file (AccExtrEnergyPhaseCorrection.pdf, 198.0 kB)
Keywords:
pbar Accumulator RF
Notes and Changes:
1) Added clarification as to which I6 file to load
2) Added instruction to correct frequency excursion during MIRF phase lock.
DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.8.9, contact Beams Document Database Administrators