Beams Document 3192-v1

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

RF Requirements for Bunching in the Recycler for Injection Into the g-2 Ring

Document #:
Beams-doc-3192-v1
Document type:
Other
Submitted by:
Chandrashekhara M. Bhat
Updated by:
Chandrashekhara M. Bhat
Document Created:
28 Aug 2008, 18:22
Contents Revised:
28 Aug 2008, 18:22
Metadata Revised:
28 Aug 2008, 18:22
Viewable by:
  • Public document
Modifiable by:

Quick Links:
Latest Version

Abstract:
A proposal to site the BNL/BU g-2 Ring[1] at Fermilab is being considered. The possibility of implementing
a practical scheme quickly and inexpensively using existing Fermilab facililities soon to be available for adaptive
reuse is attractive both for fundamental physics reasons and for program continuity. This note presents a conceptual
solution to one of the major technical challenges raised by the proposal, viz., the bunching of Booster batches
in the Recycler to a few sub-μs bunches suitable for producing muon beam of required time structure. The result
given is by no means the last word on this subject, but it has potential for accommodating changes that may be
more economical or more tolerant of the operational vagaries of the Booster. Such development of the concept is
beginning. Costing using these initial results should be meaningful, but less idealized results should be available
soon
Files in Document:
  • pdf (bnchrf-080827.pdf, 117.1 kB)
Related Documents:
DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.8.9, contact Beams Document Database Administrators