Beams Document 3321-v1

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DESIGN STATUS OF THE FNAL 8 GeV SC LINAC AS OF 04-MARCH-09.

Document #:
Beams-doc-3321-v1
Document type:
Talk
Submitted by:
Jean-Paul Carneiro
Updated by:
Jean-Paul Carneiro
Document Created:
04 Mar 2009, 11:13
Contents Revised:
04 Mar 2009, 11:13
Metadata Revised:
04 Mar 2009, 11:13
Viewable by:
  • Public document
Modifiable by:

Quick Links:
Latest Version

Abstract:
TRACK input and output files of the FNAL 8 GeV Superconducting Linac from RFQ exit to Stripping Foil. As of 04-MARCH-09
Files in Document:
Keywords:
Project_X
Notes and Changes:
Only one change was made in this 04-MARCH-09 lattice compared to the 15-MAY-08 lattice (Beams-doc-3094-v1).
This change concerns a drift in Section 5, increased from 6.3 cm to 8.48635 cm (distance between solenoids of section 4 and section 5 is now 56.4927 cm).
DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.8.9, contact Beams Document Database Administrators