Beams Document 3323-v1

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

Main Injector Proton Emittances before and after proton multibatch operation

Document #:
Beams-doc-3323-v1
Document type:
Note
Submitted by:
Vaia Papadimitriou
Updated by:
Vaia Papadimitriou
Document Created:
05 Mar 2009, 18:19
Contents Revised:
05 Mar 2009, 18:19
Metadata Revised:
05 Mar 2009, 18:19
Viewable by:
  • Public document
Modifiable by:

Quick Links:
Latest Version

Abstract:
In this study we present a study of Main Injector proton emittances at 8 and 150 GeV before and after proton multibatch operation. The study revealed several interesting features, one of them being a significant amplitude difference for the flying wire profiles of the first and second proton batch. The difference was traced to the length of the hold time of the integrator and it has been significantly decreased after the hold time was reduced.
Files in Document:
Topics:
DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.8.9, contact Beams Document Database Administrators