Beams Document 333-v2

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

Main Injector Commissioning Plan

Document #:
Beams-doc-333-v2
Document type:
Note
Submitted by:
Ruth A. Becker
Updated by:
Monica A Neuffer
Document Created:
22 Jul 1998, 00:00
Contents Revised:
22 Jul 1998, 00:00
Metadata Revised:
22 Jul 1998, 00:00
Actually Revised:
15 Aug 2003, 12:49
Viewable by:
  • Public document
Modifiable by:
  • Same as Viewable by

Quick Links:
Latest Version

Other Versions:
Beams-doc-333-v1
22 Jul 1998, 00:00
Beams-doc-333-v0
22 Jul 1998, 00:00
Abstract:
The Fermilab Main Injector is designed to deliver high intensity beams to the Tevatron, anti-proton production target and 120 GeV proton
beams to the several beam lines. The Main Injector with the Recycler Ring will increase the luminosity of the Tevatron collider program to
2x1032 cm-2sec-1. This document describes the beam on commissioning plan of the Main Injector.
Files in Document:
  • pdf (MI-244.pdf, 1016.8 kB)
Publication Information:
MI-0244
DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.8.9, contact Beams Document Database Administrators