Beams Document 3431-v1

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

Optimization of Integrated Luminosity of the Fermilab Tevatron Collider

Document #:
Beams-doc-3431-v1
Document type:
Talk
Submitted by:
Mary Convery
Updated by:
Mary Convery
Document Created:
29 Jul 2009, 09:35
Contents Revised:
29 Jul 2009, 09:35
Metadata Revised:
29 Jul 2009, 09:35
Viewable by:
  • Public document
Modifiable by:

Quick Links:
Latest Version

Abstract:
We present the strategy which has been used recently to optimize integrated luminosity at the Fermilab Tevatron proton-antiproton collider. We use a relatively simple model where we keep the proton intensity fixed, use parameters from fits to the luminosity decay of recent stores as a function of initial antiproton intensity (stash size), and vary the stash size to optimize the integrated luminosity per week. The model assumes a fixed rate of antiproton production, that a store is terminated as soon as the target stash size for the next store is reached, and that the only downtime is due to store turn-around time. An optimal range of stash sizes is predicted. Since the start of Tevatron operations based on this procedure, we have seen an improvement of approximately 35% in integrated luminosity. Other recent operational improvements have been achieved by decreasing the shot-setup time and by reducing beam-beam effects by making the proton and antiproton brightnesses more compatible, for example by scraping protons to smaller emittances.
Files in Document:
Authors:
DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.8.9, contact Beams Document Database Administrators