Rapid Cycling Synchrotron Option for Project X

Document #:
Beams-doc-3518-v1
Document type:
Proceeding
Submitted by:
Weiren Chou
Updated by:
Weiren Chou
Document Created:
07 Dec 2009, 15:08
Contents Revised:
07 Dec 2009, 15:08
DB Info Revised:
07 Dec 2009, 15:10
Viewable by:
  • Public document
Modifiable by:
Abstract:
This paper presents an 8 GeV Rapid Cycling Synchrotron (RCS) option for Project X. It has several advantages over an 8 GeV SC linac. In particular, the cost could be lower. With a 2 GeV 10 mA pulsed linac as injector, the RCS would be able to deliver 4 MW beam power for a muon collider. If, instead, a 2 GeV 1 mA CW linac is used, the RCS would still be able to meet the Project X requirements but it would be difficult for it to serve a muon collider due to the very long injection time.
Files in Document:
Authors:
Notes and Changes:
Presentation at the AHIPA09 Workshop, Oct 19-21, 2009, Fermilab