Beams Document 3770-v2

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

Meeting Minutes: Linac and 400 MeV Beam Position Monitor Upgrade

Document #:
Beams-doc-3770-v2
Document type:
Minutes
Submitted by:
Craig C Drennan
Updated by:
Craig C Drennan
Document Created:
20 Jan 2011, 09:32
Contents Revised:
23 Nov 2011, 08:33
Metadata Revised:
23 Nov 2011, 08:33
Viewable by:
  • Public document
Modifiable by:

Quick Links:
Latest Version

Other Versions:
Beams-doc-3770-v1
20 Jan 2011, 09:32
Abstract:
The meeting was called to discuss the specification and design of new beam position monitor
(BPM) electronics for the Linac and the 400 MeV accelerator beam lines. At the request of Bill
Pellico and Fernanda Garcia, AD/Instrumentation has taken responsibility for designing,
installing and commissioning the new system.
Files in Document:
DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.8.9, contact Beams Document Database Administrators