The SARAF proton / deuteron 5 MeV RFQ+superconducting linac commissioning

Document #:
Beams-doc-3779-v1
Document type:
Talk
Submitted by:
Camille M. Ginsburg
Updated by:
Camille M. Ginsburg
Document Created:
11 Feb 2011, 15:56
Contents Revised:
11 Feb 2011, 15:56
Metadata Revised:
11 Feb 2011, 15:56
Viewable by:
  • Public document
Modifiable by:

Quick Links:
Latest Version

Abstract:
Phase I of the Soreq Applied Research Accelerator Facility - SARAF, has been installed and is currently being commissioned at Soreq NRC. SARAF Phase-I linac is designed to accelerate 2 mA proton and deuteron beams at energies up to 5 MeV. The status of the main Phase I components and beam commissioning results will be discussed.
Files in Document:
  • pdf file (SARAF seminar at FNAL February 10 2011 V2.pdf, 4.7 MB)
  • powerpoint file (SARAF seminar at FNAL February 10 2011 V2.pptx, 7.4 MB)
DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.8.9, contact Beams Document Database Administrators