Proton Source Improvement Plan 2011

Document #:
Beams-doc-3781-v2
Document type:
Other
Submitted by:
Bob Webber
Updated by:
Bob Webber
Document Created:
18 Feb 2011, 09:56
Contents Revised:
22 Feb 2011, 09:22
Metadata Revised:
03 Feb 2014, 22:02
Viewable by:
  • Public document
Modifiable by:

Quick Links:
Latest Version

Other Versions:
Beams-doc-3781-v1
18 Feb 2011, 10:19
Abstract:
This document defines a plan, based on the (2010) Proton Task Force report, for the improvement and upgrade of the Proton Source. The specific objectives are to enable Linac/Booster operation capable of delivering 1.8E17 protons/hour (at 12 Hz) by May 1, 2013 and 2.25E17 protons/hour (at 15 Hz) by January 1, 2016 while maintaining Linac/Booster availability >85%, maintaining residual activation at acceptable levels, and ensuring a useful operating life through 2025. It outlines a schedule for the work and cost and manpower estimates for each task. The plan takes the Laboratory’s physics program into account and accommodates as much of the proposed program as possible.
Files in Document:
Topics:
Keywords:
Linac Booster PreAcc
Notes and Changes:
The only difference between The Plan v7 and The Plan v8 is correction of an intermediate value in Appendix 2 'total cost' column, 55,943.8 changed to 32,318.8. The bottom line of that column, calculated from bottom line row values, remains unchanged. Also very minor formatting changes to document.
Related Documents:
Associated with Events:
Proton Source December 2010 Workshop held from 07 Dec 2010 to 08 Dec 2010 in User's Center