2012 Booster LCW Improvement Plan Overview

Document #:
Beams-doc-3930-v1
Document type:
Talk
Submitted by:
Bob Webber
Updated by:
Bob Webber
Document Created:
29 Aug 2011, 09:20
Contents Revised:
29 Aug 2011, 09:20
Metadata Revised:
29 Aug 2011, 09:22
Viewable by:
  • Public document
Modifiable by:

Quick Links:
Latest Version

Abstract:
Overview presentation of the improvements planned for the Booster 95 LCW system during the 2012-2013 accelerator shutdown. Includes technical description and estimates of labor, M&S costs, and schedule. These improvements are to be funded as a part of the Proton Source Improvement Plan (PIP)
Files in Document:
Authors:
Keywords:
Booster LCW 95