Beams Document 4423-v1

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

TAC Proton Accelerator Facility: The Status and Road Map

Document #:
Beams-doc-4423-v1
Document type:
Talk
Submitted by:
Fernanda G Garcia
Updated by:
Fernanda G Garcia
Document Created:
13 Aug 2013, 12:36
Contents Revised:
13 Aug 2013, 12:36
Metadata Revised:
13 Aug 2013, 12:36
Viewable by:
  • Public document
Modifiable by:

Quick Links:
Latest Version

Abstract:
Proton Accelerator Facility (PAF) with 1 MW power and 2 GeV energy is planned in the Turkish Accelerator Center (TAC). Five other facilities are proposed under the TAC project. Our focus will be the PAF project. The proton accelerator project is at a stage of development, working towards a Technical Design Report. PAF will be constructed in a series of stages including an ion source and RFQ (3 MeV), two DTL units (up to 65 MeV), SC-spokes (150 MeV) and two SC- elliptical cavities (2 GeV). User potential, experimental stations, and design status of TAC-PAF project will be presented.
Files in Document:
DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.8.9, contact Beams Document Database Administrators