Beams Document 4550-v2

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

Booster RF System Upgrades for 15 Hz Operation

Document #:
Beams-doc-4550-v2
Document type:
Talk
Submitted by:
Alexander Sukhanov
Updated by:
Alexander Sukhanov
Document Created:
03 Mar 2014, 13:54
Contents Revised:
04 Mar 2014, 14:54
Metadata Revised:
04 Mar 2014, 14:56
Viewable by:
  • Public document
Modifiable by:

Quick Links:
Latest Version

Other Versions:
Beams-doc-4550-v1
03 Mar 2014, 13:54
Abstract:
One of the major goals of the Proton Improvement Plan (PIP) is to double the beam throughput in Booster. In order to accomplish this goal, the Booster RF system has to operate continuous at a 15Hz repetition rate, which is a factor of two over the current running conditions. The expected increase in RF duty factor triggered a series of necessary upgrades to the Booster RF system which address capability and reliabilility issues. In this talk, we will present a brief history of the Booster RF system along with details of recently completed RF system upgrades. We will also describe an overview of some technical challenges of the Booster RF cavities mechanical refurbishment, discuss the current scope and status of the work.
Files in Document:
  • ppt file (Booster_RF_15 Hz Form Talk 3-4-2014a.ppt, 8.3 MB)
  • ppt file (PIPBoostMech AP&T Seminar March 4 2014-1.pptx, 24.0 MB)
DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.8.9, contact Beams Document Database Administrators