Beams Document 4662-v1

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

Superconducting Linac in Fermilab

Document #:
Beams-doc-4662-v1
Document type:
Talk
Submitted by:
Fernanda G Garcia
Updated by:
Fernanda G Garcia
Document Created:
26 Aug 2014, 12:52
Contents Revised:
26 Aug 2014, 12:52
Metadata Revised:
26 Aug 2014, 12:53
Viewable by:
  • Public document
Modifiable by:

Quick Links:
Latest Version

Abstract:
Active discussion on the high energy physics priorities in the US carried out since summer of 2013 resulted in changes in Fermilab plans for future development of the existing accelerator complex. In particular, the scope of Project X was reduced to the support of the Long Base neutrino Experiment (LBNE) at the project first stage. The name of the facility was changed to the PIP-2 (Proton Improvement Plan). This new facility is a logical extension of the existing Proton Improvement Plan aimed at doubling average power of the Fermilab's Booster and Main Injector. Its design and required R&D are closely related to the Project X. The paper discusses the goals of this new facility and changes to the Project X linac introduced to support the goals.
Files in Document:
Keywords:
PIP-II Linac Upgrades
DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.8.9, contact Beams Document Database Administrators