Beams Document 471-v1

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

MAIN INJECTOR BPM SYSTEM UPGRADE + NUMI BEAMLINE BPM REQUIREMENTS

Document #:
Beams-doc-471-v1
Document type:
Note
Submitted by:
Brajesh Choudhary
Updated by:
Brajesh Choudhary
Document Created:
26 Feb 2003, 18:07
Contents Revised:
26 Feb 2003, 18:07
Metadata Revised:
03 Mar 2003, 15:58
Viewable by:
  • Public document
Modifiable by:
  • Same as Viewable by

Quick Links:
Latest Version

Abstract:
This document establishes the functional requirements for the Main Injector Beam Position Monitor system upgrade. The
current MI BPM system utilizes 4 detectors per betatron wavelength in both horizontal and vertical planes. At present the MI has 208 BPM for the 3320-meter ring. The associated beam lines have an additional 106 (MI8 line has 64, A1 line has 16, P1 line has 15 and P2 line has 11) BPM. + NuMI Beam line has a total of 26 BPM.
Files in Document:
Associated with Events:
MI BPM Requirements held on 25 Jul 2005
DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.8.9, contact Beams Document Database Administrators