Beams Document 4915-v2

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

A Preliminary Beam Permit System for the Neutrino-Muon Beamline

Document #:
Beams-doc-4915-v2
Document type:
Note
Submitted by:
Adam Watts
Updated by:
Adam Watts
Document Created:
06 Aug 2015, 14:15
Contents Revised:
06 Aug 2015, 15:04
Metadata Revised:
06 Aug 2015, 15:04
Viewable by:
  • Public document
Modifiable by:

Quick Links:
Latest Version

Other Versions:
Beams-doc-4915-v1
06 Aug 2015, 14:15
Abstract:
This document describes a permit system for the Neutrino-Muon beamline that can inhibit beam to the SeaQuest experiment without affecting the MTest and MCenter experiments. The system allows beam to SeaQuest only if the target is finished moving, the last two quadrupoles in the line are up to current, and the experiment's first analyzing magnet is at an acceptable current. Controlled by the permit system, the dipole string S:V100 either sends beam to the SeaQuest experiment or the Switchyard dump. This system was developed as an intermediate step while investigating the implementation of a C200/201/204 permit system as used by the accelerators.
Files in Document:
Authors:
Keywords:
SY120