Progress towards 700 kW operations in the Main Injector

Document #:
Beams-doc-5199-v1
Document type:
Talk
Submitted by:
Rob Ainsworth
Updated by:
Rob Ainsworth
Document Created:
26 Jul 2016, 13:46
Contents Revised:
26 Jul 2016, 13:46
Metadata Revised:
26 Jul 2016, 13:58
Viewable by:
  • Public document
Modifiable by:

Quick Links:
Latest Version

Abstract:
The progress towards achieving 700 kW operations since the 2015 Summer shutdown will be described. Since that time, multibatch slip-stacking in the recycler has been succesfully commissioned and beam power > 500 kW to NuMi is the norm. 700 kW has been successfully demonstrated and the steps to reach that milestone will be outlined. Plans for future high intensity running will also be discussed.