Beams Document 5364-v2

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

Prospects for a Muon Spin Resonance Facility in the MuCool Test Area

Document #:
Beams-doc-5364-v2
Document type:
Publication
Submitted by:
John A. Johnstone
Updated by:
John A. Johnstone
Document Created:
12 Apr 2017, 09:37
Contents Revised:
17 Apr 2017, 11:35
DB Info Revised:
17 Apr 2017, 11:35
Viewable by:
  • Public document
Modifiable by:
Other Versions:
Beams-doc-5364-v1
17 Apr 2017, 10:57
Abstract:
This paper investigates the feasibility of re-purposing the MuCool Test Area beamline and experimental hall to support a Muon Spin Resonance facility, which would make it the only such facility in the US. This report reviews the basic muon production concepts studied and operationally implemented at TRIUMF, PSI, and RAL and their application to the MTA facility. Two scenarios were determined feasible. One represents an initial minimal-shielding and capital-cost investment stage with a single secondary muon beamline that transports the primary beam to an existing high-intensity beam absorber located outside of the hall. Another, upgraded stage, involves an optimized production target pile and high-intensity absorber installed inside the experimental hall and potentially multiple secondary muon lines. In either scenario, with attention to target design, the MTA can host enabling and competitive Muon Spin Resonance experiments.
Files in Document:
DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.7.23, contact Beams Document Database Administrators