Beams Document 5370-v2

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

Status of the warm front end of PIP-II Injector Test

Document #:
Beams-doc-5370-v2
Document type:
Talk
Submitted by:
Alexander Shemyakin
Updated by:
Alexander Shemyakin
Document Created:
18 Apr 2017, 14:58
Contents Revised:
24 Apr 2017, 15:07
DB Info Revised:
24 Apr 2017, 15:07
Viewable by:
  • Public document
Modifiable by:
Other Versions:
Beams-doc-5370-v1
18 Apr 2017, 14:58
Abstract:
The Proton Improvement Plan II (PIP-II) at Fermilab is a program of upgrades to the injection complex. At its core is the design and construction of a CW-compatible, pulsed H- SRF linac. To validate the concept of the front-end of such machine, a test accelerator known as PIP-II Injector Test is under construction. It includes a 10 mA DC, 30 keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT), a 2.1 MeV CW RFQ, followed by a Medium Energy Beam Transport (MEBT) that feeds the first of 2 cryomodules increasing the beam energy to about 25 MeV, and a High Energy Beam Transport section (HEBT) that takes the beam to a dump. The ion source, LEBT, RFQ, and initial version of the MEBT have been built, installed and commissioned. This report presents the overall status of the warm front end.
Files in Document:
DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.7.23, contact Beams Document Database Administrators