Beams Document 7025-v1

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

PIP-II DAQ Specification Discussions

Document #:
Beams-doc-7025-v1
Document type:
Minutes
Submitted by:
Craig C Drennan
Updated by:
Craig C Drennan
Document Created:
01 Mar 2019, 12:27
Contents Revised:
01 Mar 2019, 12:31
Metadata Revised:
01 Mar 2019, 12:31
Viewable by:
  • Public document
Modifiable by:

Quick Links:
Latest Version

Other Versions:
Beams-doc-7025-v2
25 Jun 2019, 13:20
Abstract:
We started having discussion with engineers who will be involved in the design of electronic data acquisition and control systems for the PIP-II accelerator. The purpose of the meetings are to discover where the different subsystems, such as LLRF, Instrumentation, etc., will have have specifications in common. The interfaces to the Machine Protection System will be something many sub-systems will have in common. Also there is the possibility of the Front-End processing that interfaces with the Control System can be common with common hardware and software components.
Files in Document:
Topics:
DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.8.9, contact Beams Document Database Administrators