Beams Document 744-v1

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

Simulation of Pbar Stacking and Un-Stacking in the Recycler Ring

Document #:
Beams-doc-744-v1
Document type:
Note
Submitted by:
Monica A Neuffer
Updated by:
Monica A Neuffer
Document Created:
01 Sep 2002, 00:00
Contents Revised:
01 Sep 2002, 00:00
Metadata Revised:
01 Sep 2002, 00:00
Actually Revised:
25 Jul 2003, 16:15
Viewable by:
  • Public document
Modifiable by:
  • Same as Viewable by

Quick Links:
Latest Version

Abstract:
The Fermilab Recycler Ring(RR) is intented to be used as a future
antiproton storage ring for the collider Run II operation of the Tevatron. It is
proposed that about 40mA of antiproton beam from the Accumulator Ring
will be transferred to the Recycler once for every two to three hours,
stacked and cooled. This operation continues for about 10 to 20 hours
depending on the Tevatron collider needs for antiprotons. Finally, the
cooled antiproton beam will be un-stacked from the RR and transferred to
the Tevatron via the Main Injector. We have simulated stacking and
un-stacking of antiprotons in RR using multi-particle beam dynamics
simulation code ESME[1] In this paper we present results of these
simulations.
Files in Document:
  • doc (MI-0288.doc, 586.5 kB)
  • pdf (MI-0288.pdf, 443.1 kB)
Publication Information:
MI-0288
DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.8.9, contact Beams Document Database Administrators