Beams Document 762-v8

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

Simulation of Main Injector 2.5 MHz Pbar Acceleration with Space Charge and Beam Loading Effects

Document #:
Beams-doc-762-v8
Document type:
Note
Submitted by:
Monica A Neuffer
Updated by:
Vincent Wu
Document Created:
01 Feb 2003, 00:00
Contents Revised:
15 Dec 2003, 16:05
Metadata Revised:
15 Dec 2003, 16:05
Viewable by:
  • Public document
Modifiable by:
  • Same as Viewable by

Quick Links:
Latest Version

Other Versions:
Beams-doc-762-v7
12 Nov 2003, 15:54
Beams-doc-762-v6
10 Oct 2003, 12:05
Beams-doc-762-v5
09 Oct 2003, 21:54
Beams-doc-762-v4
01 Oct 2003, 12:29
Beams-doc-762-v3
30 Sep 2003, 14:07
Beams-doc-762-v2
30 Sep 2003, 11:32
Beams-doc-762-v1
01 Feb 2003, 00:00
Abstract:
In Run II four pbar bunches from the Recycler will be accelerated in the Main Injector from 8 GeV to 150 GeV. At 150 GeV the pbar bunches will be injected into the Tevatron for collider operation. Pbar transfer from Recycler to Main Injector is envisioned as 2.5 MHz bucket to bucket transfer. An acceleration scheme with a slow ramp (2.5 MHz acceleration) followed by a fast ramp (53 MHz acceleration) was previously developed. (See references [1, 2, 3].) The simulations in this report follow a similar track as those of [1, 2, 3] with the inclusions of space charge, beam loading and other miscellaneous effects. The simulations are performed using the ESME program [4].
Files in Document:
  • doc (MI 2.5MHz Pbar Acc Simulation.doc, 1.6 MB)
Authors:
Publication Information:
MI-0295
DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.8.9, contact Beams Document Database Administrators