Abstract:
This Talk was presented at the Tevatron Group Meeting on Friday
January 16th 2004. It describes a study performed Dec. 12th 2003
during the shutdown to try to understand the Pbar Scale. Although
the scale is still not understood it is probably related to the pbar
mirror not being pushed far enough into the beam pipe.