The following items must be addressed to be ready for pbar beam.
It was noted that there were 8 magnets (6 in ring) which had stainless steel heater tape removed. They were removed from the ring and reinstalled. With beam back into the Recycler, it is observed that the horizontal tune is significantly different (delta Qx ~ 0.01). As a result we should expect that the tune trombone will need to run at a different setting. We should observe that the beta and alpha matching conditions for the end of the trombone need to be determined and adjusted in the tune trombone program in order to match the new conditions. The AA timing marker for the RR has been changed. The correct procedure for adjustments to injection from the MI must be observed to avoid unnecessary effects on other timing (such as BPM's). One adjusts the MI 2.6 MHz alignment wrt the Recycler AA marker using I6 (state 23 or 25 depending upon particle type.) The sequencer has new routines for starting up from an off state.