Notes from MI/RR Meeting - 26 Feb 2003
by Bruce Brown
Notes on 10 March 2003

Vincent Wu -- 2.5 MHz Acceleration in the Main Injector

Vincent provided his presentation in PowerPoint format. It was updated today (March 10). You may find it as 2.5 mhz acceleration in the Main Injector in the Beams Document Database.

Chandra Bhat -- RR RF Issues Revisited

Please find Chandra's presentation as RR RF Issues Revisited.

Brajesh Choudhary -- Main Injector BPM Requirements Document

Brajesh was given only a few minutes to highlight the BPM requirements document which was being prepared for a review. Since the minutes were not prepared until now, I can report that both the presentation and the document are available from the Beams Document Database. You may find the presentation as REQUIREMENTS FOR THE MAIN INJECTOR & ASSOCIATED TRANSFER LINES BPMs INCLUDING THE NuMI BEAM LINE while the review document is MAIN INJECTOR BPM SYSTEM UPGRADE + NUMI BEAMLINE BPM REQUIREMENTS