This document only covers the operational modes of the MI at the time of writing. Study and future modes are NOT covered in this document.

MI Supported Operating Modes
D. Capista 10/05

8 Gev

Description
Tclock Events
MI State
Injection Beam Sync Trigger
Extraction Beam Sync Trigger(s)
TLG Module
Proton Beam from Booster to Recycler (4 x 2.5 Mhz bunches). $2D $E2
25
BES
RRBS $A2
171
Proton Beam from Recycler To MI abort. $2D $E3
25
RRBS $A4
Abort
171
Pbar Beam from Recycler to Recycler. $2D, $E4, $E0
19
RRBS $A7
RRBS $A0 184
Pbar beam from Accumulator to Recycler. $91, $2D, $E0
20
MIBS $7A
RRBS $A0
204
Proton Beam from Booster to Accumulator. $16, $2D, $93
16
BES
MIBS $7E
30
Proton Beam from Booster to Debuncher. $16, $2D, $85
16
BES
MIBS $7D
10
Proton beam to from Booster MI abort. $13, $2D 15
BES
Abort
44


120 Gev (Booster Protons)

Description Tclock Events MI State Injection Beam Sync Trigger Extraction Beam Sync Trigger TLG Module
Pbar stacking. $14, $29, $8E, $80
3
BES
MIBS $79
71
Pbar slip stacking. $14, $29, $8E, $80 28
BES
MIBS $79 61
Pbar stacking cycle to MI abort. $14, $29 3
BES
Abort
37
NuMi target ( 0-6 Booster Batches). $19, $23, $A5
21
BES
MIBS $74 73
Pbar Stacking and NuMi target. $14, $19, $23, $8D, $8E, $A5
7
BES MIBS $74
MIBS $79
72
Slip Stacking and NuMi target. $14, $19, $23, $8D, $8E, $A5 5
BES MIBS $74
MIBS $79
68
NuMi target cycle to MI abort. $19, $23
8
BES Abort
55
SY120. $13, $21, $30
24
BES MIBS $75 196
Stacking and SY120. $14, $13, $21, $80, $30 17
BES MIBS $79 58
Slip Stacking and SY120. $14, $13, $21, $80, $30 14
BES MIBS $79 67


150 Gev

Description Tclock Events MI State Injection Beam Sync Trigger Extraction Beam Sync Trigger TLG Module
Protons to Tevatron. $15, $2B, $4D
4
BES
MIBS $7C
193
Protons from Tevatron. $2E, $2A, $5D
12
BES MIBS $D8
63
Tevatron proton cycle to MI abort. $15, $2B
4
BES Abort
203
Pbars from Accumulator to Tevatron. $91, $2E, $2A, $40
23
MIBS $7A
MIBS $7B
62
Pbars from Recycler to Tevatron. $2E, $2A, $40, $E4
11
RRBS $A0
MIBS $7B 180
Tevatron pbar cycle to MI abort using protons.
$2E, $1C, $2A
30
BES Abort
219
top



Command Definitions

Closed Orbit: Sets the BPM system into the narrow bandwidth mode

Datum1: Enables or disables the command
  • Enable
  • Disable
Datum2: NA
Datum3: NA
Datum4: NA

Flash: Sets the BPM system into the wide bandwidth mode for injection and extraction flash turn measurements

Datum1: Enables or disables the command
  • Enable
  • Disable
Datum2: Transfer event
  • BES (Booster Extraction sync)
  • MIBS $TBT, $7A, $D6, $D8, $A1, $A6, $74, $75, $76, $7B, $7C, $7D, $7E
  • RRBS $A0, $A1, $A2,$A3, $A6, $A7
Datum3: Turns delay from event
  • Integer number
Datum4: Sample Bucket
  •  0-587



Filter: Sets the particle type(protons or Pbars) , the RF structure (2.5 or 53 Mhz), and the detctor signal attenuator

Datum1: Particle type
  • Proton
  • Pbar
Datum2: RF structure (MHz)
  •  2.5
  •  53
Datum3: Attenuator Setting (Db in 6Db steps)
  • 0 to -48
Datum4: NA

TBT(turn by Turn): Sets the BPM system into the wide bandwidth mode

Datum1: Enables or disables the command
  • Enable
  • Disable
Datum2: I:device used for arming or disabling the command(0=disable, otherwise the value is the arm time)
  • Displays the value of this device. Not setable from this page
Datum3: Turns delay from event
  • Integer number
Datum4: Sample Bucket
  • 0-587



MI BPM State Definitions

 120 Gev Pbar Production (State 3)
ROW
DELAY
COMMAND DATUM1 DATUM2
DATUM3 DATUM4
1

2

3

4

5
0

0

0

.055

.93
Filter

TBT

Flash

Closed Orbit

Flash
Proton

Enable

Enable

Enable

Enable

53

I:device

BES



MIBS $79
-48 Db

0(Turns)





17 (Turns)


40 (Bucket)





40 (Bucket)
top

150 Gev Collider Proton to Tevatron (state 4)

ROW
DELAY
COMMAND DATUM1 DATUM2
DATUM3 DATUM4
1

2

3

4

5
0

0

0

.055

2.6.
Filter

TBT

Flash

Closed Orbit


Flash
Proton

Enable

Enable

Enable

Enable

53

I:device

BES



MIBS $7C
-48 Db

0 (Turns)





24 (Turns)


0 (Bucket)





0 (Bucket)
top

Slip Stacking + NuMi Multi Batch (state 5)
ROW
DELAY
COMMAND DATUM1 DATUM2
DATUM3 DATUM4
1

2

3

4

5

6

7
0

0

0

.055

.43

1.2

1.2
Filter

TBT

Flash

Closed Orbit

Closed Orbit

Flash

Flash
Proton

Enable


Enable

Disable

Enable

Enable

Disable
53

TBT

BES





MIBS $79

MIBS $74
-48 Db

I:device







17 (Turns)

15 (Turns)


0 (Turns)







40 (Bucket)

160 (Bucket)
top

Pbar Stacking + NuMi Multi Batch (state 7)
ROW
DELAY
COMMAND DATUM1 DATUM2
DATUM3 DATUM4
1

2

3

4

5

6

7
0

0

0

.13

.43

1.2

1.2
Filter

TBT

Flash

Closed Orbit

Closed Orbit

Flash

Flash
Proton

Enable


Enable

Disable

Enable

Enable

Disable
53

I:device

BES





MIBS $79

MIBS $74
-48 Db

0 (Turns)







17 (Turns)

15 (Turns)


40 (Bucket)







40 (Bucket)

160 (Bucket)
top

NuMi Target cycle to MI Abort (state 8)
ROW
DELAY
COMMAND DATUM1 DATUM2
DATUM3 DATUM4
1

2

3

4

5
0

0

0

.055

.37
Filter

TBT

Flash

Closed Orbit

Closed Orbit
Proton

Enable


Enable

Disable

Enable
53

I:device

BES




-48 Db

0 (Turns)








40 (Bucket)






top

Pbars From Recycler to Tevatron (state 11)
ROW
DELAY
COMMAND DATUM1 DATUM2
DATUM3 DATUM4
1

2

3

4

5

6
0

0

0

1.1

2.6

6.9
Filter

TBT

Flash

Closed Orbit

Filter

Flash
Pbar

Enable

Enable

Enable

Pbar

Enable

2.5

I:device

RRBS $A7



53

MIBS $7B
0 Db

0(Turns)

30(Turns)



0 Db

45(Turns)


20 (Bucket) 

20 (Bucket)





20 (Bucket)
top

Reverse Injection Tuneup from Tevatron with Protons (state 12)
ROW
DELAY
COMMAND DATUM1 DATUM2
DATUM3 DATUM4
1

2
0

0
Filter

Flash
Proton

Enable

53

MIBS $D8
-24 Db

46 (Turns)


0 (Bucket)
top

Slip Stacking and Switchyard Slow Extraction (State 14)
ROW
DELAY
COMMAND DATUM1 DATUM2
DATUM3 DATUM4
1

2

3

4

5

6
0

0

0

.055

.22

.96
Filter

TBT

Flash

Closed Orbit

Closed Orbit


Flash
Proton

Enable

Enable

Disable

Enable

Enable
53

I:device

BES





MIBS $79
-48 Db

0 (Turns)







17 (Turns)


40 (Bucket)







40 (Bucket)
top

8 Gev Protons to MI Abort (State 15)
ROW
DELAY
COMMAND DATUM1 DATUM2
DATUM3 DATUM4
1

2

3

4
0

0

0

.055
Filter

TBT

Flash

Closed Orbit
Proton

Enable


Enable

Enable

53

I:device

BES


-48 Db

0 (Turns)





40 (Bucket)



top

8 Gev Protons to Accumulator or Debuncher (state 16)
ROW
DELAY
COMMAND DATUM1 DATUM2
DATUM3 DATUM4
1

2

3

4

5

6
0

0

0

.055

2.47

2.47
Filter

TBT

Flash

Closed Orbit

Flash

Flash
Proton

Enable


Enable

Enable

Disable

Enable
53

I:device

BES



MIBS $7D

MIBS $7E
-48 Db

0 (Turns)





17 (Turns)

17 (Turns)


40 (Bucket)





40 (Bucket)

40 (Bucket)
top

Stacking ans SY120 (state 17)
ROW
DELAY
COMMAND DATUM1 DATUM2
DATUM3 DATUM4
1

2

3

4

5

6
0

0

0

.055

.17

.96
Filter

TBT

Flash

Closed Orbit

Closed Orbit

Flash
Proton

Enable


Enable

Disable

Enable

Enable
53

I:device

BES





MIBS $79
-48 Db

0 (Turns)







17 (Turns)


40 (Bucket)







40 (Bucket)
top

Pbar Beam From Recycler to Recycler (state 19)
ROW
DELAY
COMMAND DATUM1 DATUM2
DATUM3 DATUM4
1

2

3

4

5
0

0

0

3.65

4.55
Filter

TBT

Flash

Closed Orbit

Flash
Pbar

Enable

Enable

Enable

Enable

2.5

I:device

RRBS $A7



RRBS $A0
0 Db

0 (Turns)

31 (Turns)



30 (Turns)


40 (Bucket)

40 (Bucket)



40 (Bucket)
top

Pbar Beam from Accumulator to Recycler (state 20)
ROW
DELAY
COMMAND DATUM1 DATUM2
DATUM3 DATUM4
1

2

3

4

5
0

0

0

1.7

4.55
Filter

TBT

Flash

Closed Orbit

Flash
Pbar

Enable

Enable

Enable

Enable

2.5

I:device

MIBS $7A



RRBS $A0
-10 Db

0 (Turns)

17 (Turns)



30 (Turns)


40(Bucket)

40(Bucket)



40 (Bucket)
top

NuMi Multi Batch (state 21)
ROW
DELAY
COMMAND DATUM1 DATUM2
DATUM3 DATUM4
1

2

3

4

5

6
0

0

0

.13

.43

1.2
Filter

TBT

Flash

Closed Orbit

Closed Orbit

Flash
Proton

Enable


Enable

Disable

Enable

Enable
53

I:device

BES





MIBS $74
-48 Db

0 (Turns)







17 (Turns)


40 (Bucket)







40 (Bucket)
top

Pbars from Accumulator to Tevatron (state 23)
ROW
DELAY
COMMAND DATUM1 DATUM2
DATUM3 DATUM4
1

2

3

4

5

6
0

0

0

1.65

2.6

6.9
Filter

TBT

Flash

Closed Orbit

Filter

Flash
Pbar

Enable

Enable

Enable

Pbar

Enable

2.5

I:device

MIBS $7A



53

MIBS $7B
0 Db

0 (Turns)

17 (Turns)



0 Db

45 (Turns)


20 (Bucket)

20 (Bucket)





20 (Bucket)
top

Switchyard 120 Gev (state 24)
ROW
DELAY
COMMAND DATUM1 DATUM2
DATUM3 DATUM4
1

2

3

4

5

6
0

0

0

.055

.4

.96
Filter

TBT

Flash

Closed Orbit

Closed Orbit

Flash
Proton

Enable


Enable

Disable

Enable

Disable
53

I:device

BES





MIBS $75
-48 Db

0 (Turns)







17 (Turns)


40 (Bucket)







40 (Bucket)
top

Proton Beam to Recycler and/or from Recycler to MI Abort (state 25)
ROW
DELAY
COMMAND DATUM1 DATUM2
DATUM3 DATUM4
1

2

3

4

5

6

7

8
0

0

0

.055

.07

3.35

4.2

4.4
Filter

TBT

Flash

Closed Orbit

Filter

Flash

Flash

Closed Orbit
Proton

Enable


Enable

Disable

Proton

Enable

Enable

Enable
53

I:device

BES



2.5

RRBS $A2

RRBS $A3


-10 Db

0 (Turns)





0 Db

30 (Turns)

30 (Turns)



40 (Bucket)







40 (Bucket)

40 (Bucket)
top

Slip Stacking 120 Gev Pbar Production (state 28)
ROW
DELAY
COMMAND DATUM1 DATUM2
DATUM3 DATUM4
1

2

3

4

5
0

0

0

.14

.93
Filter

TBT

Flash

Closed Orbit

Flash
Proton

Enable

Enable

Enable

Enable

53

I:device

BES



MIBS $79
-48 Db

0(Turns)





17 (Turns)


40 (Bucket)





40 (Bucket)
top

Pbar Acceleration cycle to MI Abort Using Protons (state 30)
ROW
DELAY
COMMAND DATUM1 DATUM2
DATUM3 DATUM4
1

2

3

4
0

0

0

.055
Filter

TBT

Flash

Closed Orbit
Proton

Enable

Enable

Enable

53

I:device

BES


-20 Db

0 (Turns)






0 (Bucket)




top