Minutes of the 10 June 2011 Tevatron Dept Meeting https://indico.fnal.gov/conferenceDisplay.py?confId=4521 * (Two) Weekly Operations Summary (Xiaolong Zhang) - The Tevatron delivered 126 pb^-1 over the past 2 weeks. There were 18 stores with initial luminosities between 142 and 407 ub^-1/s. Five stores were lost prematurely - 2 from lightning-induced glitches within an 8 hour shift. One shot was lost during scraping when a front-end computer locked up and caused repeated collimator move commands to be issued. Lots of various maintenance was performed with the available access time. In general, the machine is running very well and only minor orbit smooths and tune changes have been needed to maintain the performance. The month of May was our best ever for delivered luminosity = 286 pb^-1. * Plan for Next Week (All) - Keep on delivering lots of luminosity. - Luminosity Leveling (Ron, mid-store - short interruption to experiments) - Hollow electron beam (Giulio and Alex, end-of-store) - Pbar Longitudinal Damper (Tan et al., proton-only) - RF Phase Shaking (Tan, proton-only)