Program Development Program Development Document 334-v1

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

Proton Economics in the Project X Era

Document #:
ProgDev-doc-334-v1
Document type:
Note
Submitted by:
Eric J Prebys
Updated by:
Eric J Prebys
Document Created:
11 Jul 2008, 14:58
Contents Revised:
11 Jul 2008, 14:58
DB Info Revised:
11 Jul 2008, 14:58
Viewable by:
  • Public document
Modifiable by:
Abstract:
This note summarizes basic proton economics in the Project X era under the base line specifications. The average power and total protons available to the high energy and 8 GeV programs are presented as a function of the energy chosen for the high energy beam.
Files in Document:
Keywords:
ProjectX
DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.7.23, contact Program Development Document Database Administrators