1-v2 |
A Dispersion Mismatch Criterion for the Main Injector to Tevatron Transfer Line |
Rodney E. Gerig |
Transfer Lines
|
06 Feb 2020 |
1584-v1 |
Collection of BPM Related Papers from the Tev Commissioning Era |
Alan Baumbaugh et al. |
Instrumentation
BPM
BPM
Intensity Measurements
Beam Loss Monitors (BLM)
BPM
|
18 Feb 2005 |
806-v1 |
The Tevatron Beam Position And Beam Loss Monitoring Systems |
Alan Baumbaugh et al. |
Instrumentation
Beam Loss Monitors (BLM)
BPM
|
25 Aug 2003 |
33-v1 |
Dynamic Aperture with gamma_t Jump |
Rodney E. Gerig |
Beam Dynamics
|
14 Aug 2003 |
771-v1 |
Analog Box Description |
Rodney E. Gerig |
BPM
Tevatron BPM
BPM
|
08 Aug 2003 |
770-v1 |
Operations Bulletin #924 : Towards a Better Understanding of BPM Data Acquisition |
Rodney E. Gerig |
BPM
Tevatron BPM
BPM
BPM
|
08 Aug 2003 |
769-v1 |
Operations Bulletin #888 |
Rodney E. Gerig |
BPM
Hardware
Tevatron BPM
BPM
|
08 Aug 2003 |
30-v1 |
Main Injector Corrector Strength Analysis |
Rodney E. Gerig |
Power Supplies
Magnets
|
14 Aug 1990 |
27-v2 |
Main Injector Sextupole Requirements |
Rodney E. Gerig |
Lattice
Magnets
Magnets
|
25 Jul 1990 |
4-v1 |
A New Lattice for the Main Injector |
Rodney E. Gerig |
Lattice
Design Properties
|
31 Oct 1989 |
3-v1 |
A Dynamic Lattice Insertion for Main Injector Extraction |
Rodney E. Gerig |
Lattice
Extraction
Beam Dynamics
|
31 Oct 1989 |