978-v1 |
Synclite Study During December Shutdown |
Harry Cheung et al. |
Instrumentation
Tevatron Group
SyncLite (SL)
|
11 Jan 2005 |
587-v3 |
Performance of a Beam Monitor in the Fermilab Tevatron Using Synchrotron Light |
Harry Cheung et al. |
SyncLite (SL)
|
03 Aug 2003 |
579-v1 |
Synclite Abort Gap Study II |
Harry Cheung |
Meeting Minutes
Instrumentation
Tevatron Group
SyncLite (SL)
Beam Studies
|
29 Apr 2003 |
561-v1 |
Study of beam in abort gap using the Synclite monitor |
Harry Cheung |
SyncLite (SL)
|
18 Apr 2003 |
459-v1 |
Second Beam Orbit Study to Calibrate the Synclite Scale |
Harry Cheung |
SyncLite (SL)
|
31 Mar 2003 |
534-v1 |
Abort gap synclite study |
Harry Cheung |
Tevatron Group
SyncLite (SL)
|
28 Mar 2003 |
466-v1 |
Studies for the Synclite Scale |
Harry Cheung et al. |
SyncLite (SL)
|
24 Feb 2003 |
455-v1 |
Manuals for Avtech pulser used for Synclite |
Harry Cheung |
SyncLite (SL)
|
17 Feb 2003 |
451-v1 |
Synclite - A Transverse Beam Profile Monitor |
Harry Cheung |
SyncLite (SL)
|
14 Feb 2003 |
415-v1 |
synclight box pictures |
Harry Cheung et al. |
Emittance
SyncLite (SL)
Alignment
|
27 Jan 2003 |
215-v1 |
Bumping the orbit to calibrate the SyncLite 2 scale |
Harry Cheung |
SyncLite (SL)
Beam Studies
|
13 Dec 2002 |